Forum quick links
VRP Compliance Calculator Error
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Kevin Chow on
I opted to use the LEEDonline provided VRP Compliance Calculator to show compliance with the IEQ p1. Upon completion of the form it says I am not compliant.
Separating lighting metering from plug load metering.
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Rudolph Carneiro on
I have seen many comments in this forum stating that plug loads should be metered seperately from lighting loads. I'm not sure if seperating these loads is actually necessary.
Major refurbishment - existing building
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Alicia Freire on
Can this credit not be achieved in an existing building where one floor (not the top floor) is being assessed and the existing roof will be left untouched?
Labs21 Issue
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Eddie Cuevas on
I am working on a LEED-EBOM project that does not qualify for a Portfolio Manager rating due to the fact that lab space makes up more than 10% of the building area.
definition of 'mixed use'?
NC-2009 PIf2:Project Summary Detailsposted by emily reese moody on
Hi, We have a CS project that will have retail space on the ground level floor, and office space for the rest of the building.
Area calculation for trees
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Muhammad Faisal Azizullah Jaffar on
I have a project where trees, shrubs and groundcovers will be used. While the area coverage of shrubs and groundcovers is relatively easy to calculate, trees are a bit more tricky.
Calculating materials costs to achieve MR credits
NC-2009 MRc3:Materials Reuseposted by Remigio Antonio Rancan on
Hi all, i don't find Table 2 indicated in LEED reference Guide for green BD+C p. 337. Can anyone help me? Thanks a lot.
N, Qunit (tons) and Refrigerant Charge (Rc) in lb/ton
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Adi Negara, LEED AP BD+C on
Dear All, I'm trying to fill the EAc4 form, but I don't understand about HVAC&R at all. I'm not too sure what is N, Q and Rc column meaning.
Can gas metering only qualify for EAc3.2?
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by James Doyle on
Under LEED EBOM 2009 I am considering attempting metering under credit EAc3.2 for a 200,000 sq. ft.
Residential Kitchen Equipment
Healthcare-v2009 WEc4.3:Water use reduction - food waste systemsposted by Rosemary Ziemann on
If the project is using residential grade kitchen equipment (this is for a licensed Nursing Home) - therefore we do not have a food waste disposer systems or pulpers, extractors, etc.