Forum quick links
Adequate measurement equipment and procedures
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by CAIO DE MELO on
We are working on an office building with fan-coils units conditioning office spaces on typical floors and several multi-split ceiling cassette units conditioning technical occupied areas (maintena
LEED NC or Homes Mid-Rise?
posted by Bethany Davis on
I'm unsure as to whether I should pursue LEED NC or Homes Mid-Rise certification for a university dormitory project (4-5 stories).
IAQ Procedure contaminant testing - costs and concerns
Pilot-Credits EQpc68:Indoor air quality procedureposted by Lyle Axelarris on
This comment is also posted in the EBOM 2009 - EQpc68 forum: Does anyone have any experience with the GC/MS contaminant testing required by the IAQ Procedure?
manipulation of the form
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Craig Flandermeyer on
From my experience, the add/delete row on the template only works on the last row. Any magic for changing/deleting other rows without having to re enter the entire form?
2-year 24-hour Design Storm in Indonesia
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Ivan Priatman on
Hi, I'm currently doing a project in Indonesia and having trouble to find the 2-year 24-hour design storm data.
Approved Equivalent Standard
CI-2009 EAp2:Minimum energy performanceposted by Jos Schild on
Projects outside the US may use USGBC approved equivalent standards to show compliance to the Minimum Energy Performance. Is there a list with these standards for Europe and/or The Netherlands?
BMPs in series
NC-2009 SSc6.2:Stormwater design - quality controlposted by Tristan Roberts on
I heard a comment from a LEED user that GBCI reviewers do not understand the application of Best Management Practices in series.
Applicability of LEED credits to Master Site
posted by Rosemary Ziemann on
There are a number of LEED credits which theoretically should be applicable to an entire campus (i.e.
Are Clerestory Windows considered a roof, or a window?
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Mark Elsensohn on
I am working on a Healthcare v2009 project where we are removing and infilling a bunch of clerestory windows.
Enclosed Room?
NC-2009 MRp1:Storage and collection of recyclablesposted by Carrie Laurendine on
Can the "dedicated space" be a space set aside in part of a bigger "back of house" service room (near loading dock)?