EAPr2- Lighting Control (shut-off control and space control)

CI-2009 EAp2: Minimum Energy Performance
posted by Ramesh Narayanan on Feb 25, 2011, 1:55 am

Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory...

Last reply: Simon Sue, May 10, 2011, 3:12 am

lighting space by space

CI-2009 EAp2: Minimum Energy Performance
posted by Billy Ng on Apr 22, 2011, 2:07 am

under ASHRAE Table 9--6, there is a space type as bank/office - banking activtiy area. how to justify this?
I have an i-bank office fitout project. can i use that for my lighting in my...

Last reply: Tristan Roberts, Apr 22, 2011, 5:58 pm

Existing LIghting- Commercial Interior

CI-2009 EAp2: Minimum Energy Performance
posted by John Bauer on Jun 13, 2010, 6:35 am

We are doing a fit-out for 1 floor in an existing building in China. The Shell and Core installation provided by the landlord includes the lighting fixtures. So my question is if this existing...

Last reply: Billy Ng, Mar 29, 2011, 3:41 am

EAp2 Equipment Motors

CI-2009 EAp2: Minimum Energy Performance
posted by Eric Claycamp on Mar 22, 2011, 11:23 am

For a LEED CI project that includes a fitness center, do you count the motors in the treadmills and cross trainers? No fitness equipment I have found is Energy Star rated. These loads can be...

Last reply: David Hubka, Mar 23, 2011, 5:09 pm

EAc1 required 2 points

CI-2009 EAp2: Minimum Energy Performance
posted by Jennifer Berthelot-Jelovic on Mar 22, 2011, 3:41 pm

I know that for EAc1 there was a requirement that "All LEED for New Construction project registered after June 26, 2007 are required to achieve at least two (2) points." Since I am working on a...

Last reply: David Hubka, Mar 23, 2011, 5:05 pm

Design Engineer Signatory

CI-2009 EAp2: Minimum Energy Performance
posted by Sundararaj Subburaman on Mar 23, 2011, 3:11 am

Please let me know if the HVAC Designer will be representing the Design Engineer Signatory for the EA P2? If not who will be the Design Engineer - MEP designer?

Last reply: David Hubka, Mar 23, 2011, 5:00 pm

ASHRAE 90.1-2007 Lighting Compliance Documentation

CI-2009 EAp2: Minimum Energy Performance
posted by Natalie Terrill on Mar 2, 2011, 1:21 pm

Page 3 of the ASHRAE Lighting Compliance Documentation has a table for Interior Lighting Compliance Test for Additional Lighting which reads Total Additional Interior Lighting Power Allownace (...

Last reply: Paul Conrad, Mar 2, 2011, 3:38 pm

EAPr2- Lighting Control mandatory in Ashrae standard

CI-2009 EAp2: Minimum Energy Performance
posted by Ramesh Narayanan on Feb 25, 2011, 1:51 am

Ashrae 9.4.1 Lighting control states that "Buildings larger than 5000 square feet must have an automatic control device to shut off all lighting in the building. Is this only the tenant space...

Last reply: Paul Conrad, Feb 25, 2011, 8:42 am

"Optional" Upload EAp2-1

CI-2009 EAp2: Minimum Energy Performance
posted by Andrew Mitchell, P.E. on Jan 26, 2011, 12:45 pm

Is it optional to upload all of the compliance forms if you initial the box and qualify for EAc1.3? What if EAc1.3 is not achieved but you have done the model and have some savings shown?...

Last reply: Paul Conrad, Feb 2, 2011, 2:11 pm

Lighting Controls- Lighting Power Density Table

CI-2009 EAp2: Minimum Energy Performance
posted by Erson Bolos on Jan 7, 2011, 2:47 pm

Hi,

This is the first time I've done LEED CI and EA P2. On the online form, there is a table for inputing your project's Lighting Power Desity to show how much reduction you have achieved...

Last reply: Paul Conrad, Jan 7, 2011, 3:57 pm