Forum quick links
On the other hand ...
posted by Lawrence Lile on
I'll certainly not be shedding a tear to be losing the cumbersome LEED V3 LEEDONLINE website, with it's slow-loading, Internet-Explorer-only, buggy SAP interface.
Requirements for Copy/Printer Rooms
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Sean Blaevoet on
Does LEED require the copy/printers to be in a separate room with doors?
Classification of handsinks
CS-2009 WEc1:Water efficient landscapingposted by Sean Blaevoet on
How are "handsinks" classified? Is it lavatory? Is it kitchen sink? Or is it exempt? Or other?
Lighting Building Area method
CS-2009 EAp2:Minimum energy performanceposted by Pia Öhrling on
If the building is an office building with a small part retail and restaurant how should the areas be calculated for lighting when using the Building Area method?? The space usage types listed in P
Baseline System configuration for mixed use condominium
NC-2009 EAp2:Minimum energy performanceposted by Jason Biondi on
We are working on a 10 story mixed use building consisting of approx.
SS CR 1 - Site Selection
CI-2009 SSc1:Site selectionposted by Harsharan Kaur on
Hi, We are planning to get our facility certified under LEED CI (USGBC) Ver. 3.0.
CMU as regional materials
Homes-v2008 MRc2:Environmentally preferable productsposted by Benjie Herrera on
Can we achieve .5 pt. of Environmentally preferable product credit if we will be using CMU in the fence/landscaping area/grass area? Is this area considered as exterior wall? Pls. Advise.
Occupancy sensors: No override switch but with task lighting
NC-2009 IEQc6.1:Controllability of systems - lightingposted by André Harms on
Hi, There are several spaces in a project I'm working on that have been designed with an occupancy sensor without an override switch but each individual work station does have controllable (on/off
ASHRAE Standard
CS-2009 IEQp1:Minimum indoor air quality performanceposted by ilkyaz ceren güçlü on
Hello, We are carrying out LEED certification of an office building.
Natural ventilation on a hangar
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Renato Sandoval on
I am working on a hangar ventilated naturally by a clerestory on the roof top. This project would be applicable to the credit IEQ.c5 ?