Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Pilot credits

EBOM-v4 INc1:Innovation
posted by  Charalampos Giannikopoulos  on 

Is there any particular reason for which a Pilot credit from the general EBOM rating system such as the "Design for active occupants" credit would not be accepted for LEED v4 O+M - Data Centers?

3
Fri Aug 7, 2015, 3:42 pm

EnergyPro for Whole Building Energy Simulation

NC-2009 EAp2:Minimum energy performance
posted by  Logan Dorrell  on 

We have a project in which they are attempting to use EnergyPro to show compliance for credits EAp2 and EAc1.

3
Fri Aug 7, 2015, 3:42 pm

Can FSC Product Certification replace invoices?

CI-2009 MRc7:Certified wood
posted by  Mauricio Ramirez  on 

Hello. I'm pursuing this credit on a project in Mexico City.

2
LEED AP BD+C
SINERGI Integrated Building Sciences, LLC
LEEDuser Basic Member
0 thumbs up
Fri Aug 7, 2015, 3:30 pm

To what extent we provide Tenant fitout

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Indochine Engineering VN  on 

Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Aug 7, 2015, 2:10 pm

How to document a non-LEED-certifiable building?

NC-2009 EAp2:Minimum energy performance
posted by  Anya Fiechtl  on 

Our project includes a separate non-LEED certifiable building with no regularly occupied space and no FTE, that houses the renewable energy and ground source heat pump systems for the main building

7
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Fri Aug 7, 2015, 1:11 pm

Naturally ventilated open cafeteria

NC-2009 IEQc7.1:Thermal comfort - design
posted by  Magda Aghababyan  on 

Dear all, We have a fully naturally ventilated open cafeteria (No walls, only roof mounted on top of columns) that is occupied only for max about 2 hrs a day during 1hr lunch break and two tea bre

3
Fri Aug 7, 2015, 12:31 pm

Separate CxA's for Fundamental and Enhanced Cx?

NC-2009 EAc3:Enhanced commissioning
posted by  Timothy Casper  on 

In a traditional design-bid-build project, does the CxA need to be responsible for both fundamental and enhanced Cx? Or can these credits be split between two CxA's?

8
Default Avatar
Tetra Tech
LEEDuser Basic Member
3 thumbs up
Thu Aug 6, 2015, 4:06 pm

Coffee Shop

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Kathryn West  on 

Gosh, this credit is never 100% in the "yes" column when you have a building that is not a traditional office space. I have a coffee shop in my building.

3
Wed Aug 5, 2015, 7:54 pm

building is eligible or not

CS-2009 IEQc7:Thermal comfort - design
posted by  Ron Dean  on 

I am bit confused about the requirements of the Thermal comfort-desing’ credit for C&S Can you please help me on figure out if my building is eligible or not. The building is mechanical ventil

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Aug 5, 2015, 6:19 pm

Residential high rise with school at the base

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Ilana Judah  on 

We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Wed Aug 5, 2015, 2:32 pm