Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

HVAC system changed after certification completed

General forums
posted by  Johannes Hopf  on 

Our project (LEED NC 2009 Gold) was certified 3 years ago. Now the new landlord would like to add humidification to AHU. Is the certification affected?

3
Thu Apr 17, 2014, 10:57 pm

Elevators (Lift/Escalators) & LEED EAC1 credit

Schools-2009 EAc1:Optimize Energy Performance
posted by  Ameet AA  on 

Can I include the Elevators (Lift/Escalators) in EAC1 credit calculation using the whole building simulation method? I was told by an Elevator supplier that Regenerative Converter in lift could be

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 16, 2014, 8:11 pm

Construction Review Submittal Deadline

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Sara Goenner Curlee  on 

I am working on a campus project targeting LEED Platinum under NCv2.2.

2
Director of LEED Support
U.S. Green Building Council
LEEDuser Premium Member
25 thumbs up
Wed Apr 16, 2014, 6:09 pm

Polluted well water use

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Magda Aghababyan  on 

Dear all, We have a project that uses water from a polluted well for toilet flushing. The water is of low quality and is not drinkable.

3
Wed Apr 16, 2014, 4:49 pm

Walking path through another building

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Heather DeGrella  on 

Our project is on a University campus but is not using the campus approach. University students cut through other campus buildings frequently.

2
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Wed Apr 16, 2014, 3:52 pm
8
Wed Apr 16, 2014, 6:26 am

VOC testing method

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Ralph Bicknese  on 

Does GBCI require a certain testing method for VOC compliance?

2
Tue Apr 15, 2014, 10:32 pm

Path 2: Storm Water Quantity Control - Discharge into Estuary

CI-2009 SSc1:Site Selection
posted by  Gail Williams  on 

Hello, We are working on a project in Ireland where the surface water runoff from the site flows directly into a tidal reach (estuary) without attenuation, as this has been confirmed to be the mo

3
Default Avatar
Sustainability Consultant
Dagher Engineering
LEEDuser Basic Member
51 thumbs up
Tue Apr 15, 2014, 7:44 pm

question about a building at a major port

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Carrie Laurendine  on 

client has a office building (previously developed land) being built along a waterway at a major US port.

3
Green Building Consultant
The Cadmus Group
LEEDuser Basic Member
83 thumbs up
Tue Apr 15, 2014, 7:05 pm

Glare Control - Glazing film

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Kristina Abrams  on 

Can a film be installed as a form of glare control for spaces with illuminance levels above 500fc?

3
Tue Apr 15, 2014, 5:27 pm