Can occupant survey & monitoring be used as ID Credit?

NC-2009 IEQc7.2:Thermal comfort - verification
posted by  Lance Collins  on 

Our project is not able to show compliance with the requirements if IEQc7.1, but has still installed a permanent monitoring system and the owner has agreed to conduct occupant comfort surveys every

2
Sustainable Building Consultant
Green Bridge Consulting
LEEDuser Expert
28 thumbs up
Thu Dec 27, 2012, 7:18 pm

Fuel Cell & PV energy

NC-2009 EAc1:Optimize energy performance
posted by  Gaston Viau  on 

Hi, our project is a commercial building which will get 100% of the electricity from PVs (20%) and Gas Fuel Cells (80%).

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Thu Dec 27, 2012, 7:05 pm

NREL TP-55-46101 “Grocery Store 50% Energy Savings” document

NC-2009 EAp2:Minimum energy performance
posted by  Anna Barton, LEED AP BD+C  on 

Does anyone know if the NREL TP-55-46101 “Grocery Store 50% Energy Savings” document can be referenced in the calcs for the baseline and proposed refrigeration equipment for the NC 2009 Retail EAp2

3
Thu Dec 27, 2012, 5:58 pm

Colorants added at the Point-of-Sale

NC-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Laurent Kanago  on 

This is in reference to Green Seal GS-11 section 4.4 and 4.5. I am working on a project that is looking to use Dryfall Paint. the Flat paints meet the

2
Thu Dec 27, 2012, 5:56 pm

What is a "view factor?"

CS-2009 IEQc8.2:Daylight and views - views
posted by  Lauren Ulmer  on 

In the Reference Guide, under Exemplary Performance for this credit, item #4 mentions a "view factor." What is that? I can't find an explanation of it in the Reference Guide or on LEED User.com.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Dec 27, 2012, 5:16 pm

Recycled content counted as a regional material

NC-2009 MRc5:Regional materials
posted by  Sara Heppe  on 

I am getting conflicting information about the allowable extraction/harvesting point for recycled content in materials.

5
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed Dec 26, 2012, 5:01 pm

Treating CUP as a DES?

General forums
posted by  Irina Foster  on 

Hi, I am working on a LEED Healthcare project. The hospital building is phase 1 of a number of phases within a large master plan area.

3
Mon Dec 24, 2012, 6:53 pm

Commissioning Walk-in Freezers / Coolers

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Richard Woodward  on 

We have a mixed use new office / commercial kitchen project with owner occupiers.

3
Fri Dec 21, 2012, 7:45 pm

Calculating Vot in Credit Template

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Rick Servoss  on 

The Template calculates Vot by dividing Voz by Ev. ASHRAE 62.1 2007 arrives at Vot by dividing Vou by Ev, not Voz.

2
Default Avatar
Mechanical Engineer
LEEDuser Basic Member
23 thumbs up
Fri Dec 21, 2012, 6:54 pm

M&V Plan - Specific Acceptable Range(s) of Error

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Marina Andrade  on 

Hello, I just got the review comment requesting the “specific acceptable range(s) of error”, follow the comment bellow. “TECHNICAL ADVICE: Please revise the Measurement and Verification Plan, as

2
Default Avatar
Principal
G. F. Shymko & Associates Inc.
LEEDuser Basic Member
97 thumbs up
Fri Dec 21, 2012, 11:40 am