Forum quick links
Preferred file format for plan uploads - PIF4
posted by Lew Bonadies on
When uploading floor plans, site plans, elevations etc. are pdf files the accepted format, or can we use the new Autodesk Design Review dwf file format?
Missing LEED information for some items
CI-2009 MRc4:Recycled Contentposted by Sandra Eremic on
There are a few items in my project for which LEED information is not available - like desk lamps, desk pads, hangers, coasters, even some fabrics. Can I still submitt for the credits?
LEED EBOM
posted by Emily Catacchio on
Hi Qiang,
You could try this video. Not sure this is exactly what you're looking for, but it's a start.
Water Closet Baseline
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Brandon Dark on
Hello, I am working on a large LEED CI project where the tenant is occupying the majority of an existing building.
C&S scope
CS-2009 IEQp1:Minimum IAQ Performanceposted by Rubén M. R. on
We are working on a C&S project but in the middle of the design phase we learned that a gym will lease three floors.
IEQp1 and 62MZCalc
NC-2009 IEQp1:Minimum IAQ Performanceposted by Taylor Ralph on
In a project's IEQp1 we want to use a non-default value for occupancy of a Conference Room (a Critical Zone).
Credit for temporary irrigation
CS-2009 WEc1:Water Efficient Landscapingposted by Steve Salzman on
Hello, I'm wondering what people's experiences have been regarding the removal of irrigation after one year - specifically, what is considered "temporary"?
Tenant Infill within a Parking Garage
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jon Texter on
Our Project is a restaurant taking up less than 75% of a parking garage. We are going for SSc3.3 Case 1 Option 1. Our lease provides us with access to two parking spaces.
Building footprint
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Albert Tappe on
Our project is an office tower connected to a large 4 level car park with a public plaza on top and retail at the perimeter on ground level.
Faucet Aerators use
CS-2009 WEp1:Water Use Reductionposted by Alessio Zampaglione on
Can someone confirm me that the use of faucet aerators is an allowed way to achieve WEp1 WE c3 for Leed CS v3 ? It's impossible to find a faucet with a so low flow rate in italy.