Forum quick links
DSIRE...
posted by Tristan Roberts on
DSIRE is the best nationwide resource on incentives like this. I would start there.
FM-200 (HFC-227ea) as Clean Agent Fire Suppression
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Ted Vanderlinden on
Clean agent fire suppressant materials have no bearing on the Life Cycle Ozone Depletion calculation as they are not used as refrigerants.
PIf4-mechanical schedule
posted by Tarek Dalati on
what is meant pi L3-mechanical schedule. where can i find filled project information forms(1-4) regards, tarek
Appeal documentation
posted by Susann Geithner on
We submitted two appeals last year for EA P2 and meet the GBCI on the Green-built to discuss the appeal process. They were very helpful and understanding.
maintaining LEED certification
posted by Tristan Roberts on
Pinky, if you're talking about LEED-NC v2.2, this is not a question of maintaining your certification. Once awarded, only the LEED-EBOM certifiation needs to be maintained.
LEED Certifications for Multiple Buildings
posted by Keerthi Ratnayake on
We have two buildings to be certified; one new and one existing. What are the requirements for these to be evaluated as one building for the LEED certifications? HVAC chillers etc.
Reused Metal Shelving
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by James Shook on
We have a library renovation project that is reusing the existing shelving in the space instead of purchasing new.
Baseline Building Envelope requirements
NC-2009 EAc1:Optimize Energy Performanceposted by alberto carlesi on
Hi, I'm modeling a building (not residential),for EAc1, located in climate zone 6 (winter design temperature 5°F).
Base Building for a mixed use project
NC-2009 EAc1:Optimize Energy Performanceposted by Graciela Carrillo on
We have a project that is a mix-used 23,000 SF bldg. The lower story is commercial (8,000 SF) and 2-stories of residential (15,000 SF).
Graphic Ink
CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Grace Ming on
Hello all, One of our CI project will be using the blinds with Graphic prints. My question is if the ink needs to comply with any of IEQ requirements? Any guidance would be greatly appreciated.