Topic | Recent |
---|---|
Labs21 IssueEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Eddie Cuevas on Oct 25, 2013, 12:19 pm
I am working on a LEED-... Last reply: Tristan Roberts, Nov 4, 2013, 9:48 pm |
|
District hot waterEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Anna Korinkova on Jul 17, 2013, 10:17 am
Hi all LEEDusers, has anybody experienced a project supplied by district hot water but the units were in... Last reply: Eric Johnson, Jul 17, 2013, 11:04 am |
|
Question about the results in Performance PeriodEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Ron Dean on Jul 4, 2013, 10:07 am
There is a possibility that in the 12 months of the Performance Period, during the first six months not obtained satisfactory results provided the measures and strategies to achieve the minimum... Last reply: Michael Opitz, Jul 12, 2013, 6:48 pm |
|
Normalizing the BaselineEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Timothy Casper on Jun 12, 2013, 9:33 am
Given our unique project conditions we are pursuing this credit via Case 2, Option 2B. This option allows for normalization of historical energy data for things such as, changes to occupancy,... Last reply: Michael Opitz, Jun 20, 2013, 9:28 pm |
|
Off-grid Project in MexicoEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Jeremy Kuhre on Jun 4, 2013, 5:03 pm
We are currently evaluating an off-grid hospitality project in Mexico. The project is primarily powered by a 32kW PV array which is sometimes supplemented by a propane generator. Except for the... Last reply: Michael Opitz, Jun 20, 2013, 9:12 pm |
|
Case 2 Calculator- Space TypesEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Timothy Casper on Jun 4, 2013, 9:47 am
Our project is a mixed use building used by community groups and has several different space types within it (theater, classrooms, event areas, kitchen, offices). Can I break these spaces out on... Last reply: Michael Opitz, Jun 20, 2013, 9:05 pm |
|
Projects outside the U.S.EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Stefanie Hoffmann on Jun 3, 2013, 5:07 am
Dear all, |
|
EAp2&c1- Case 2 Option 2B NormalizationEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Lourdes Salinas on May 2, 2013, 2:20 pm
We are working on a manufacturing plant in Mexico that began operations in 2011. Our performance period has began in May 2013 and will end in December 2013 (therefore we will have 3 years of... Last reply: Peter Locke, May 3, 2013, 4:57 pm |
|
Prerequisite 2 & Credit 1EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Paula Hernandez on Apr 26, 2013, 8:18 am
Does anybody know if projects outside EEUU are elegible for Energy Star Rating?. I am working in an... Last reply: Michael Smithing, Apr 26, 2013, 8:35 am |
|
EAp2/EAc1- Case 2 Option 2bEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Peter Locke on Apr 19, 2013, 4:41 pm
We are submitting a museum bldg and have had confirmation from... |