Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED v2.2 design credit re-evaluation during construction submit

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susan Walter  on 

We are wrapping up a LEED v2.2. project and looking to submit for our construction review. The design credits have been through the process and the design review has been accepted.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Mar 12, 2013, 1:40 pm

Understanding how hazardous materials effect calculations

NC-2009 MRc2:Construction Waste Management
posted by  Renee Shirey  on 

Scenario: select asbestos-containing material (ACM) to be left in exist. bldg (and is allowed to be) and will be handled during demolition.

6
Mon Mar 11, 2013, 10:43 pm

No tenants at this stage

General forums
posted by  R Jones  on 

What happens if the developer doesn't have any tenants onboard at the time of certification? Can a draft lease agreement suffice?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 11, 2013, 8:25 am

Form Template Compliance

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Erin Cowan  on 

We are working with a University that collects everything but Glass however that is detailed out in the special circumstances.

2
Sustainable Project Manager
KEMA Services
LEEDuser Basic Member
28 thumbs up
Fri Mar 8, 2013, 10:35 pm

Option 3, share whole bldg energy and water data

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Courtney Royal  on 

Hello! This may be a stupid question, but I am reviewing the requirements for EAc5.1 and came across Option 3.

2
Fri Mar 8, 2013, 10:34 pm

Total for Division 12-Reused Furniture Amount PLUS Cost of New??

CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishings
posted by  Michelle Bracewell-Musson  on 

The higher the amount for reused furniture, the higher the number for Total Division 12, therefore more difficult to obtain the 30%. Ex.

4
Fri Mar 8, 2013, 10:32 pm

LEED ID for Electric Vehicle Charging Stations

CI-2009 IDc1:Innovation in Design
posted by  Jennifer Berthelot-Jelovic  on 

Is it likely that by providing 5% of the parking with electric vehicle charging stations we will be able to achieve an ID point? If so, how do I got about documenting it?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 8, 2013, 9:31 pm

Lighting control for Barracks sleeping bays

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jeff Koehler  on 

I have a large open sleeping bay for about 30 people. I have 2 rows of lights. Is having each row switched separately good enough for the credit?

2
Fri Mar 8, 2013, 6:11 pm

vegetable oil recycling

NC-2009 IDc1:Innovation in Design
posted by  Emily Hagy  on 

My office is working on a large Multi-building Mixed used NC LEED 2009 project in a urban area. The first floor will have retail space, potentially a few restaurants, and a small grocery store.

3
Director, Sustainable Design Solutions
HDR
LEEDuser Basic Member
25 thumbs up
Fri Mar 8, 2013, 4:56 pm

Password and Zone Floor Area questions

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Gabriela Almquist  on 

Hi, I'm trying to add a regularly occupied space (row) in the excel spreadsheet and it gives me an error message saying I do not have permission.

14
Fri Mar 8, 2013, 4:28 pm