Log in
Forum » EBOM-2009 SSc2
Topic

Snow Melt

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Elizabeth Felder on Jul 29, 2014, 9:37 am

We have an ice melt product that consists of CMA and Dolomite (and a proprietary blend), but the manufacturer will not release the chemical breakdown. Is it assumed that this product is non-...

Last reply: Kristina K, Jun 19, 2024, 4:27 pm

Metal Maintenance Cleaners

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Ryan Nelson on Aug 7, 2017, 4:22 pm

Can someone assist and explain the best practice to assessing Metal Maintenance products for compliance with LEEDv2009? Does the product need to meet the low-...

Last reply: Trista Brown, Aug 8, 2017, 1:00 pm

Innovation Credit Asphalt?

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Marissa Hebert on Jul 12, 2017, 12:10 pm

I'm using this credit for an Innovation in Design point for a new building/major renovation. The contractor's LEED consultant has told us we need to include low...

Last reply: Trista Brown, Jul 25, 2017, 7:53 pm

Latest LEED Online Form

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by AtSite Inc on Feb 15, 2017, 3:12 pm

The most recent LEED Online form I'm looking at asks for the plan to be uploaded but then only asks you to "Summarize how each operational element was implemented in an environmentally sensitive...

Last reply: Trista Brown, Feb 15, 2017, 8:28 pm

Powered Equiptment Compliance

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Nelina Loiselle on Feb 26, 2013, 4:57 pm

It is unclear to me what exactly qualifies a piece of equipment as a environmentally preferable. Does it have to meet all the BMPs listed in the chart above? For example does snow blower need to...

Last reply: Kimberly Schlaepfer, Feb 13, 2017, 2:42 pm

noise and emissions controls

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by cathy keagle on Sep 29, 2016, 11:38 am

Our reviewer has asked for noise control levels to be set by a maximum db level. Does anyone know if there is a specific limit for this? Also the reviewer has asked for specific emissions...

Last reply: Kimberly Schlaepfer, Feb 13, 2017, 2:39 pm

Performance Metric for Powered Equipment

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by LUCY WILLIAMS on Apr 7, 2015, 9:23 am

The LEED User "Powered Equipment Inventory" Worksheet, located under the "Documentation Toolkit" tab provides guidance on performance metrics as follows:
How to document performance based...

Last reply: cathy keagle, Oct 12, 2016, 4:03 pm

No more pressure washing with water only

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Nelina Loiselle on Jan 2, 2014, 4:31 pm

We just received the following review comment: "The plan states that the...

Last reply: Trista Brown, Jun 29, 2016, 7:05 pm

EBOM SSc2: policy vs practice for snow removal

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Drew DePalma on Sep 15, 2015, 1:06 pm

Hi,
I have read in this forum that if no deicer is applied during a performance period that a project would be in compliance with that element of the SSc2 credit requirements.
However...

Last reply: Trista Brown, Oct 9, 2015, 6:07 pm

Graffiti Remover

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Ryan Tinus on Aug 5, 2015, 10:37 am

Hello all. I have a project that is purchasing graffiti remover for use on the exterior of the building. Do you have any guidance regarding...

Last reply: Trista Brown, Aug 5, 2015, 11:01 am