Forum quick links
Printing used for bldg occupants, but outsourced
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Ted Mendoza on
I have a client that has several departments under a building that is being LEED EB-OM certified. One of the departments has a "significant" budget attributed to generating handouts, flyers, etc.
Use of clerestories for IEQc8.1?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Karen Stewart on
After review of the requirements for IEQc8.1, it appears to me that light from clerestories is not allowed in the calculations for this credit. Am I missing something?
Clarification on Minimum Daily Transit Service
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Colin Inderwish on
We're also attempting option 1. The project is located in a fairly dense area with a total of 4 different light rail stops within a 1/2 mile walking distance.
online form
NC-2009 MRc2:Construction Waste Managementposted by Rick Vayo on
Hi, I'm having trouble with the online form. I've filled in the required information, but the percentage of waste diverted is not totaling for me. I'm not sure what I'm doing wrong. thanks,
Electric bicycles in Asia
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Louise Schlatter on
We are starting to get projects in Asia and have learned that they use both standard (human operated) bicycles and also something we don't have in the US: electric bicycles.
Phased Occupancy and IAQ Testing
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Melissa Wrolstad on
I have a CI project with 4 floors and phased occupancy. Two floors will be occupied while two are still under construction.