Schools-2009 SSp2:Environmental Site Assessmentposted by Terry Squyres on
If your project finds contamination on site during construction, does remediation have to be complete before the LEED design application can be submitted?
Excluding Casework from IEQc8.1 & IEQc8.2
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by John Drigot on
On a previous LEED for Schools 2009 project I was sucessful in not including the space occupied by built-in casework in the occupied square footage of a space.
Certification Requirement
posted by Peter Doo on
The Reference Guide states that the final step to certification occurs when "certificates of occupancy for buildings...have been issued..." Does this mean that 100% of the buildings must be constru
LEED Boundary and equipment
CS-2009 EAp2:Minimum Energy Performanceposted by Gabriela Hernández Castillo on
We have a mixed use project with several buildings on it, from which one of them will apply for LEED-CS certification.
Occupancy Sensors
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Lindsay Duncan on
In the past GBCI has stated as a side note: "For future projects, please note that occupancy sensors alone are not an acceptable form of lighting control".
Existing classrooms on an addition
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Joe Piedimonte on
We have a project that is an addition to an existing school. The existing classrooms are included in the LEED boundary, but they have only had minor updates of mechanical systems.
Warehouse - Heating Only
NC-2009 EAc1:Optimize Energy Performanceposted by Curt Pascoe on
There has been much talk that warehouses with heating-only (no cooling) must still model a cooling system in the baseline and proposed case, since the space is defined as conditioned.