Forum quick links
proposed energy savings for unfinished spaces based on local energy code?
CS-v4 EAp2:Minimum energy performanceposted by Erin Holdenried on
Nowadays, many local energy codes are exceeding LEED's ASHRAE 90.1-2010 Baseline. Has anybody successfully claimed energy savings for unfinished tenant spaces based on local code?
Case 3 - On-site electricity storage
NC-v4.1 EAc4:Grid Harmonizationposted by Tine Steen Larsen on
How is the use of batteries evaluated under case 3 "On-site thermal and/or electricity storage: demonstrate that strategy reduces on-peak load by at least 10% as compared to peak electrical dem
Baseline Energy Model - Outside Air Ventilation Rate for Zoo Spaces
NC-v4 EAp2:Minimum energy performanceposted by Mini Laird on
We would like to confirm our approach to determining the outside air ventilation rate for a Zoo project for the Baseline energy model, specifically for an animal holding area.
Baseline Required Outdoor Airflow for Toilets
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi Forum Users!
Regd. Primary Secondary Pump Arrangement in PRM Baseline System 8 Modelling
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,
System fan power - Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the system fan power calculation described in section G.1.2.9.
ASHRAE 90.1 Section 6.5.3
NC-v4 EAp2:Minimum energy performanceposted by Michael Abramson on
Good afternoon all,
Process or non-process? Kitchen Hood Exhaust and Makeup Air
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I thought I recalled reading that the HVAC energy related to a commercial kitchen hood was considered Process Energy.
Parking area to be included for EUI consideration
NC-v4.1 EAp2:Minimum Energy Performanceposted by John on
Hi,
Glare control strategy UGR < 19 or UGR =< 19?
NC-v4.1 EQc6:Interior Lightingposted by Yara Ibrahim on
The EQ Credit Interior Lighting specifies for the ‘Glare Control’ strategy to “achieve a Unified Glare Rating (UGR) rating of <19 using software modelling calculations of the designed lighting”.