Permanent furnitureNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Pascal Genest-Richard on Jul 4, 2014, 5:22 pm
We would like to know if it is possible to start the flush out (and maybe even finish it) before all permanent furniture is installed. The furniture is fabricated in a shop outside the site and... Last reply: Tristan Roberts, Jul 26, 2014, 8:32 am |
|
Concerning CarpetNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Omar Elrawy on Jun 26, 2014, 5:30 am
Dear all, Last reply: Haytham Mohamed, Jul 3, 2014, 4:08 am |
|
Expansion project FLUSH OUTNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Jorge Torres-Coto on Jun 13, 2014, 5:35 pm
We have a project that is an expansion to an existing facility. It is NOT an addition. Though the majority of the existing facility was unrenovated, with the exception of one ventilation system... |
|
Floor Area for Flush OutNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Nikhilesh Srinivasan on May 20, 2014, 1:51 pm
I'm looking for some help with the area to be used for a flush out calculation. The gross project area included in PI-Form 3 includes electric/janitor closets, core toilets, mechanical room and... |
|
Performing testing under Option 2- number of samplesNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Adriana Hansen on May 19, 2014, 5:13 pm
For performing testing under Option 2 (... Last reply: Tom Nichols, May 20, 2014, 12:44 pm |
|
IBC Occupancy Classification & Testing RequirementsNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Zach Hoffman on May 16, 2014, 8:09 pm
I am wondering if IBC Group S-1 Occupancy zones are required to be tested per IEQc3.2. Last reply: Dale Walsh, May 16, 2014, 11:42 pm |
|
IAQ Testing- Maximum ConcentrationsNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Donald Green on Feb 3, 2014, 10:06 amto the v4 question, please do it over on the v4 forum. Thanks! Log in or register to post comments ... Last reply: Tristan Roberts, May 5, 2014, 3:49 pm |
|
Flush Out Path 1 Only During DaytimeNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Esteban Martinez on Apr 29, 2014, 6:34 pm
We are currently pursuing this credit using the flush out option Path 1. We are capable of maintaining the temperature in at least 60°F and RH no higher than 60% since the ventilation systems are... |
|
IEQc3.2 Option 2: Air TestingNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Christopher Strunk on Apr 29, 2014, 2:27 pm
Currently doing a LEED v.2009 project and are looking to pursue IEQc3.2, Option 2. We got a question from the air quality tester asking about the specific requirements for testing. The testing... Last reply: Christopher Strunk, Apr 29, 2014, 3:11 pm |
|
Do all units have to run at 100% OA for this credit?NC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Saju Varghese on Apr 17, 2014, 3:14 pm
We have 4 A/C Units providing air conditioning to a building, two of them are 100% OA units and two of them are providing the total air supply cfm (OA + recirulated air) is 7000 cfm and 8600... Last reply: Saju Varghese, Apr 21, 2014, 5:40 pm |