Dormitory that is No Smoking

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by April Ambrose on Jan 26, 2010, 6:02 pm

I have a NCv2009 project that is a dormitory on a college campus.

This is a case where the reference guide and LEED Online do not seem to match. We have a dormitory project that is not...

Last reply: Tristan Roberts, Mar 11, 2011, 8:58 am

Measurement Protocol

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by LUCY WILLIAMS on Jan 13, 2011, 5:11 pm

Is there any protocol for a scenario where there are two buildings joined by an indoor atrium space? One building prohibits smoking, the LEED project, and the adjacent building does not. There...

Last reply: Tristan Roberts, Jan 21, 2011, 10:07 am

School with Total Ban...How many signs?

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Jean Marais on Nov 29, 2010, 9:14 am

We have a total ban policy.

I've taken ASHRAE 62.1's 25mm (1") minimum text size as the Norm for No Smoking Signs requirement (even though the requirement is for "smoking allowed" signs)....

Last reply: Jean Marais, Jan 14, 2011, 10:55 am

Blower Door Test Quantity in Residential Buildings

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Patrik Lazzari on Oct 22, 2010, 6:18 pm

I'm trying to find out how many blower door tests are required in a 4-story residential building with appr. 90 units. Do I need to perform a test in EACH unit or just a sample? If sampling, what...

Last reply: Keith Amann, Nov 4, 2010, 1:27 pm

HERS Rater

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by David Herrera on Sep 13, 2010, 1:33 pm

Hello,

I wanted to ask if I perform a Door Blower Test with a HERS Rater will it be acceptable by the USGBC to comply with my...

Last reply: Tristan Roberts, Sep 16, 2010, 5:44 pm

Smoking area in retail area

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by gabriel Morales on Sep 10, 2010, 2:00 pm

The project is registered under LEED for Core & Shell version 2.0, the project size is as follows: Total Project Size (Gross sf) 846.113,72 sqft, Commercial Office 402.969,90 sqft, Retail 50....

Last reply: Tristan Roberts, Sep 10, 2010, 5:41 pm

Weather stripping common corridor doors

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Alex Wong on May 10, 2010, 4:07 pm

We have a residential building with common corridors. We are supplying corridor pressurization through the corridor and the intent is to have make-up air supplied to suites through door leakage...

Last reply: Jean Marais, Aug 14, 2010, 6:43 am

No smoking policy in urban area and the 25' rule.

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Paul Girello on Jul 22, 2010, 4:08 pm

We are certifying two buildings in Boston to be occupied by the State. The state has a No Smoking Policy on all properties. We know that we will have to determine how to convey this policy to the...

Last reply: Keith Amann, Jul 26, 2010, 10:19 am

Are smoking receptacles allowed at doorways?

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by John Klein on Jul 19, 2010, 12:32 pm

There will be no smoking in our buildings (DoD requirement); we will have smoking allowed outside the 25' perimeter outdoors. As such, would it violate the requirements of IEQp2 to have smoking...

Last reply: Tristan Roberts, Jul 19, 2010, 12:38 pm

distance from building openings

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Emmanuel Pauwels on May 3, 2010, 12:35 pm

If a dedicated smoking area is on the rooftop of a buildng and there is an operable window on the floor below, does the distance between the smoking zone and the window has to be 25 feet? (or...