Log in
Forum » NC-2009 MRc4
Topic

Definition of Assembly

NC-2009 MRc4: Recycled Content
posted by Martin Meehan on May 11, 2016, 12:04 pm

LEED language seems a bit loose about what must be considered...

Last reply: Martin Meehan, May 12, 2016, 4:10 am

3 LEED projects sitting on a parking & retail layer cake

NC-2009 MRc4: Recycled Content
posted by Susan Di Giulio on Dec 1, 2015, 6:15 pm

Hi,

We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects...

Last reply: Robin Dukelow, Apr 21, 2016, 1:50 pm

Items that are used for either MRc4 or MRc3

NC-2009 MRc4: Recycled Content
posted by Erika Duran on Mar 24, 2015, 4:26 pm

reach thresholds for Reuse Credits MRc1 or MRc3, It CAN count reused material from the jobsite as diverted construction waste under MRc2. Michelle & Tristan made relevant posts in the MRc2 forum...

Last reply: Tristan Roberts, Mar 14, 2016, 2:37 pm

Fire Extinguisher & Cabinet (MRc4 & MRc5)

NC-2009 MRc4: Recycled Content
posted by Elliot Young on Feb 3, 2016, 10:11 am

Hi,
we just received a submittal for fire extinguishers and recessed fire extinguisher cabinets - claiming to have...

Last reply: Jon Clifford, Feb 4, 2016, 8:47 pm

Planting recycled conent

NC-2009 MRc4: Recycled Content
posted by Thomas Perkins on Jan 25, 2016, 1:05 pm

“Site materials (31.60.00 Foundations, 32.10.00 Paving, 32.30.00 Site Improvements, and 32.90.00 Planting) that are permanently installed can be included in the MR credits. Just be sure that your...

Last reply: Jon Clifford, Jan 26, 2016, 7:04 pm

Recycled content in Steel frame of facade

NC-2009 MRc4: Recycled Content
posted by Indochine Engineering VN on Jan 6, 2016, 1:54 am

Hi, I would like to ask in case that facade manufacturer cannot confirm...

Last reply: RETIRED, Jan 11, 2016, 1:18 pm

Anchor Bolt Recycle Content

NC-2009 MRc4: Recycled Content
posted by Sarfaraj Khan on Dec 9, 2015, 12:02 am

Hi

I have a anchor bolt material and the supplier is saying that the steel is the world most recycle material. Modern steel production methods use at least 25% of recycled steel to make...

Last reply: Sarfaraj Khan, Dec 10, 2015, 10:25 am

Calculating material use for mock-ups.

NC-2009 MRc4: Recycled Content
posted by Peter Doo on Sep 11, 2015, 9:34 am

When working on large projects with substantial mock-ups, should one include these materials in the project documentation? I would assume that since these costs are in the project budget, they...

Last reply: Jon Clifford, Sep 11, 2015, 8:10 pm

Seismic isolation system

NC-2009 MRc4: Recycled Content
posted by Noriko Nagazumi on Aug 5, 2015, 2:29 am

Hi,
Our project includes seismic isolation system, because the project building is located in earthquake prone country.
Our question is which construction division does "seismic...

Last reply: Noriko Nagazumi, Sep 10, 2015, 1:40 am

Assembly Calculator for Materials with Recycled Content

NC-2009 MRc4: Recycled Content
posted by Caroline PIN on Aug 27, 2015, 2:06 pm

Dear all,
I use the...

Last reply: Caroline PIN, Sep 2, 2015, 1:33 pm