Topic | Recent |
---|---|
Definition of AssemblyNC-2009 MRc4: Recycled Contentposted by Martin Meehan on May 11, 2016, 12:04 pm
LEED language seems a bit loose about what must be considered... Last reply: Martin Meehan, May 12, 2016, 4:10 am |
|
3 LEED projects sitting on a parking & retail layer cakeNC-2009 MRc4: Recycled Contentposted by Susan Di Giulio on Dec 1, 2015, 6:15 pm
Hi, We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects... Last reply: Robin Dukelow, Apr 21, 2016, 1:50 pm |
|
Items that are used for either MRc4 or MRc3NC-2009 MRc4: Recycled Contentposted by Erika Duran on Mar 24, 2015, 4:26 pmreach thresholds for Reuse Credits MRc1 or MRc3, It CAN count reused material from the jobsite as diverted construction waste under MRc2. Michelle & Tristan made relevant posts in the MRc2 forum... Last reply: Tristan Roberts, Mar 14, 2016, 2:37 pm |
|
Fire Extinguisher & Cabinet (MRc4 & MRc5)NC-2009 MRc4: Recycled Contentposted by Elliot Young on Feb 3, 2016, 10:11 am
Hi, Last reply: Jon Clifford, Feb 4, 2016, 8:47 pm |
|
Planting recycled conentNC-2009 MRc4: Recycled Contentposted by Thomas Perkins on Jan 25, 2016, 1:05 pm
“Site materials (31.60.00 Foundations, 32.10.00 Paving, 32.30.00 Site Improvements, and 32.90.00 Planting) that are permanently installed can be included in the MR credits. Just be sure that your... Last reply: Jon Clifford, Jan 26, 2016, 7:04 pm |
|
Recycled content in Steel frame of facadeNC-2009 MRc4: Recycled Contentposted by Indochine Engineering VN on Jan 6, 2016, 1:54 am
Hi, I would like to ask in case that facade manufacturer cannot confirm... Last reply: RETIRED, Jan 11, 2016, 1:18 pm |
|
Anchor Bolt Recycle ContentNC-2009 MRc4: Recycled Contentposted by Sarfaraj Khan on Dec 9, 2015, 12:02 am
Hi I have a anchor bolt material and the supplier is saying that the steel is the world most recycle material. Modern steel production methods use at least 25% of recycled steel to make... Last reply: Sarfaraj Khan, Dec 10, 2015, 10:25 am |
|
Calculating material use for mock-ups.NC-2009 MRc4: Recycled Contentposted by Peter Doo on Sep 11, 2015, 9:34 am
When working on large projects with substantial mock-ups, should one include these materials in the project documentation? I would assume that since these costs are in the project budget, they... Last reply: Jon Clifford, Sep 11, 2015, 8:10 pm |
|
Seismic isolation systemNC-2009 MRc4: Recycled Contentposted by Noriko Nagazumi on Aug 5, 2015, 2:29 am
Hi, Last reply: Noriko Nagazumi, Sep 10, 2015, 1:40 am |
|
Assembly Calculator for Materials with Recycled ContentNC-2009 MRc4: Recycled Contentposted by Caroline PIN on Aug 27, 2015, 2:06 pm
Dear all, Last reply: Caroline PIN, Sep 2, 2015, 1:33 pm |