LEED 2009 Energy UpdatesNC-2009 EAc1: Optimize Energy Performanceposted by Theresa Lehman on Sep 30, 2015, 5:23 pm
Did anyone see the that USGBC has launched a set of proposals to increase the energy minimums for LEED v2009, which is open for project registration until October 31, 2016. Please visit:... Last reply: Scott Bowman, Oct 19, 2015, 3:35 pm |
|
Ventilated Only Space SimulationNC-2009 EAc1: Optimize Energy Performanceposted by TOMAS URIBE on May 6, 2014, 1:42 pm
Hello Marcus! In the HVAC design of a project, there is a space where supply ventilation is included in order to accomplish the minimum amount of air required by ASHRAE 62.1-2007 standard... Last reply: Marcus Sheffer, Oct 2, 2015, 4:16 pm |
|
Rounding of Percent Energy Cost Savings for EAc1 PointsNC-2009 EAc1: Optimize Energy Performanceposted by Joseph Chappell on Aug 13, 2015, 2:53 pm
Hi all, We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%. This project is an existing building... Last reply: Christopher Schaffner, Sep 14, 2015, 10:04 am |
|
DES Option 2 when project contains the DESNC-2009 EAc1: Optimize Energy Performanceposted by Stephanie Graham on Sep 9, 2015, 5:34 pm
Project is LEED-NC v2009 project in which a building contains a... Last reply: Marcus Sheffer, Sep 10, 2015, 11:35 am |
|
Group Certification NC V3 EAc1NC-2009 EAc1: Optimize Energy Performanceposted by Neil Rosen on Sep 9, 2015, 1:19 pm
I am working on a project that consists of 2 buildings on one site that I plan on certifying using the Group Certification option discussed in the LEED Campus Guidance document. In... Last reply: Marcus Sheffer, Sep 9, 2015, 2:15 pm |
|
Process Energy Savings- Exceptional Calculation- Dry CoolersNC-2009 EAc1: Optimize Energy Performanceposted by MYRON JORDAN on Jul 30, 2015, 12:23 pm
My inquiry is based upon reducing the energy consumption of a chilled water system which is being used in a manufacturing facility. The chilled water system is specifically used for the... Last reply: Marcus Sheffer, Sep 3, 2015, 2:30 pm |
|
free waste heat from outside of LEED project for heatingNC-2009 EAc1: Optimize Energy Performanceposted by Mónika Egyed on Nov 26, 2014, 10:29 am
Our project is a small office building in Europe, on site of a great industrial plant with the same owner. The office building aims to achieve LEED Gold certification, while the plant does not.... Last reply: Emmanuel Pauwels, Sep 1, 2015, 1:27 pm |
|
Renovation project Envelope questionNC-2009 EAc1: Optimize Energy Performanceposted by Saju Varghese on Aug 20, 2015, 10:14 am
I'm not really sure how the envelope should be input in baseline vs. proposed. Here is the reviewer comment "The LEED Summary report indicates that a single wall construction was modeled in both... Last reply: Marcus Sheffer, Aug 20, 2015, 1:59 pm |
|
2 energy point requirementNC-2009 EAc1: Optimize Energy Performanceposted by Mike Stopka on Aug 17, 2015, 6:31 pm
I just wanted to verify that "Two (2) points mandatory for all LEED for New Construction projects registered after June 26, 2007" rule is no longer in effect. Referring to this: Last reply: Mike Stopka, Aug 18, 2015, 10:08 am |
|
Process LoadNC-2009 EAc1: Optimize Energy Performanceposted by Muzammal Abbas on Aug 18, 2015, 3:06 am
Dear all, Last reply: Marcus Sheffer, Aug 18, 2015, 9:10 am |