Topic | Recent |
---|---|
Weighted Average of Renovated and Addition energy saving targetsNC-2009 EAp2: Minimum Energy Performanceposted by Emmanuel Miranda on Jul 7, 2014, 4:00 pm
Hello, I've searched the forum but haven't found a definite answer. I have building consisting of 86% existing and 14% addition and I would like to calculate the weighted average energy... Last reply: Emmanuel Miranda, Jul 9, 2014, 2:36 pm |
|
Modeling infiltration in the baseline case for an existing bldg?NC-2009 EAp2: Minimum Energy Performanceposted by on Jul 9, 2014, 1:40 pm
I put this comment in a reply below, but I'm afraid it wont be seen, so I'm starting a new thread... We are renovating an existing... Last reply: , Jul 9, 2014, 2:36 pm |
|
FIre station modelingNC-2009 EAp2: Minimum Energy Performanceposted by David Hahn on Jul 8, 2014, 10:54 am
I am currently working on a fire station building in NC and I'm using HAP 4.8 to model this building vs. the baseline. For our proposed building occupied areas, we are using a VRF system with a... Last reply: Marcus Sheffer, Jul 8, 2014, 11:08 am |
|
Should I perform NFRC TESTNC-2009 EAp2: Minimum Energy Performanceposted by SUNG SU KIM on Feb 17, 2013, 11:02 pm
Hi Guys~ I have a question... Last reply: LEEDme Lorenzi, Jul 3, 2014, 2:48 am |
|
Chiller Minimum Equipment Efficiency nonstandard conditionsNC-2009 EAp2: Minimum Energy Performanceposted by Adriana Hansen on May 29, 2014, 6:04 pm
The project team has specified a centrifugal chiller of over 600 Tons with a nonstandard conditions. Last reply: Marcus Sheffer, Jul 2, 2014, 11:54 am |
|
Energy Modeling and LEEDNC-2009 EAp2: Minimum Energy Performanceposted by Lisa Abraham on Jul 2, 2014, 11:48 am
We are creating a Revit model using Revit 2014. Going for LEED2009, (ASHRAE 90.1-2007). Do we need two models? Thinking of bringing model into eQUEST. Is that necessary to determine baseline vs.... Last reply: Marcus Sheffer, Jul 2, 2014, 11:52 am |
|
Energy Modeling and LEEDNC-2009 EAp2: Minimum Energy Performanceposted by Lisa Abraham on Jul 2, 2014, 11:35 am
We are creating a Revit model using Revit 2014. Going for LEED2009, (ASHRAE 90.1-2007). Do we need two models? Thinking of bringing model into eQUEST. Is that necessary to determine baseline vs.... |
|
Museum process loadNC-2009 EAp2: Minimum Energy Performanceposted by Charalampos Giannikopoulos on Jul 2, 2014, 9:11 am
Has anyone ever experienced process load lower than 25%? We are working on a museum currently having... Last reply: Marcus Sheffer, Jul 2, 2014, 10:38 am |
|
Table 9.4.5 basketball courtNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Jul 1, 2014, 12:05 pm
I’m modeling a project where there is an external basketball court, which is illuminated. I’m considering Table 9.4.5 “Lighting power densities for building exteriors” for the baseline model. For... Last reply: Marcus Sheffer, Jul 1, 2014, 12:21 pm |
|
Ventilation (G3.1.2.6)NC-2009 EAp2: Minimum Energy Performanceposted by Curtis Clark on Jun 24, 2014, 6:00 pm
A proposed building is designed which the minimum flow rate on the... Last reply: Marcus Sheffer, Jun 25, 2014, 11:16 am |