Weighted Average of Renovated and Addition energy saving targets

NC-2009 EAp2: Minimum Energy Performance
posted by Emmanuel Miranda on Jul 7, 2014, 4:00 pm

Hello,

I've searched the forum but haven't found a definite answer. I have building consisting of 86% existing and 14% addition and I would like to calculate the weighted average energy...

Last reply: Emmanuel Miranda, Jul 9, 2014, 2:36 pm

Modeling infiltration in the baseline case for an existing bldg?

NC-2009 EAp2: Minimum Energy Performance
posted by on Jul 9, 2014, 1:40 pm

I put this comment in a reply below, but I'm afraid it wont be seen, so I'm starting a new thread...

We are renovating an existing...

Last reply: , Jul 9, 2014, 2:36 pm

FIre station modeling

NC-2009 EAp2: Minimum Energy Performance
posted by David Hahn on Jul 8, 2014, 10:54 am

I am currently working on a fire station building in NC and I'm using HAP 4.8 to model this building vs. the baseline. For our proposed building occupied areas, we are using a VRF system with a...

Last reply: Marcus Sheffer, Jul 8, 2014, 11:08 am

Should I perform NFRC TEST

NC-2009 EAp2: Minimum Energy Performance
posted by SUNG SU KIM on Feb 17, 2013, 11:02 pm

Hi Guys~

I have a question...
As you know, to comply ASHRAE 90.1 Mandatory Provision, we should perform...

Last reply: LEEDme Lorenzi, Jul 3, 2014, 2:48 am

Chiller Minimum Equipment Efficiency nonstandard conditions

NC-2009 EAp2: Minimum Energy Performance
posted by Adriana Hansen on May 29, 2014, 6:04 pm

The project team has specified a centrifugal chiller of over 600 Tons with a nonstandard conditions.
It has been sent an AHRI certificate showing the compliance with ASHREA 90.1-2007 and...

Last reply: Marcus Sheffer, Jul 2, 2014, 11:54 am

Energy Modeling and LEED

NC-2009 EAp2: Minimum Energy Performance
posted by Lisa Abraham on Jul 2, 2014, 11:48 am

We are creating a Revit model using Revit 2014. Going for LEED2009, (ASHRAE 90.1-2007). Do we need two models? Thinking of bringing model into eQUEST. Is that necessary to determine baseline vs....

Last reply: Marcus Sheffer, Jul 2, 2014, 11:52 am

Energy Modeling and LEED

NC-2009 EAp2: Minimum Energy Performance
posted by Lisa Abraham on Jul 2, 2014, 11:35 am

We are creating a Revit model using Revit 2014. Going for LEED2009, (ASHRAE 90.1-2007). Do we need two models? Thinking of bringing model into eQUEST. Is that necessary to determine baseline vs....

Museum process load

NC-2009 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Jul 2, 2014, 9:11 am

Has anyone ever experienced process load lower than 25%? We are working on a museum currently having...

Last reply: Marcus Sheffer, Jul 2, 2014, 10:38 am

Table 9.4.5 basketball court

NC-2009 EAp2: Minimum Energy Performance
posted by Francesco Passerini on Jul 1, 2014, 12:05 pm

I’m modeling a project where there is an external basketball court, which is illuminated. I’m considering Table 9.4.5 “Lighting power densities for building exteriors” for the baseline model. For...

Last reply: Marcus Sheffer, Jul 1, 2014, 12:21 pm

Ventilation (G3.1.2.6)

NC-2009 EAp2: Minimum Energy Performance
posted by Curtis Clark on Jun 24, 2014, 6:00 pm

A proposed building is designed which the minimum flow rate on the...

Last reply: Marcus Sheffer, Jun 25, 2014, 11:16 am