Topic | Recent |
---|---|
LEED NC 2009 for factory buildingsNC-2009 EAp2: Minimum Energy Performanceposted by Rathnashree Bharadwaj on Aug 13, 2014, 2:29 am
The project is a manufacturing facility with ancillary buildings such as admin, health centre, canteen, utility and security blocks. The buildings are not physically connected to each other. Do... Last reply: Marcus Sheffer, Sep 2, 2014, 10:25 am |
|
Energy Modeling for CasinoNC-2009 EAp2: Minimum Energy Performanceposted by Chris Hammett on Aug 28, 2014, 5:40 pm
Hello. I am working on the energy model for a casino/hotel/nightclub. I have been contracted only to develop the model, no input in regards to design. I have built the entire model in Energy Pro... Last reply: Marcus Sheffer, Aug 28, 2014, 7:46 pm |
|
Baseline Fan Power Heat RecoveryNC-2009 EAp2: Minimum Energy Performanceposted by Matt Scott on Aug 27, 2014, 5:26 pmto a different discussion forum. You should not sum the static pressures. Log in or register to post comments Matt Scott Engineer N.E. Fisher & Associates, Inc. LEEDuser Basic Member 18 thumbs up August 28,... Last reply: Marcus Sheffer, Aug 28, 2014, 2:05 pm |
|
Motor PowerNC-2009 EAp2: Minimum Energy Performanceposted by Omar Elrawy on Aug 26, 2014, 4:59 am
Dear All, Duty Flow... Last reply: Marcus Sheffer, Aug 26, 2014, 9:34 am |
|
Old HVAC equipment transferred from other siteNC-2009 EAp2: Minimum Energy Performanceposted by Yastimy Jupson on Aug 21, 2014, 7:12 am
Hello, I have a new factory project recently. The owner wants to transferred old HVAC equipment from their old factory to this new factory. Do these old HVAC equipment transferred from... Last reply: Marcus Sheffer, Aug 26, 2014, 9:30 am |
|
Modeling a humidifier in the baseline caseNC-2009 EAp2: Minimum Energy Performanceposted by Gustav Alfaro on Aug 11, 2014, 1:31 am
Hi, I am working on a data center project under NC 2009. For the proposed case we have self-contained steam electric humidifiers that are an accessory for the CRAH units; the question is if those... Last reply: Marcus Sheffer, Aug 21, 2014, 4:48 pm |
|
Parking Garages Abutting Conditioned SpaceNC-2009 EAp2: Minimum Energy Performanceposted by Jon Clifford on Aug 21, 2014, 9:38 am
While we are on the topic of parking garages, I have had projects where a parking garage abutted a conditioned building. Reviewers have treated them differently. During the review of one... Last reply: Marcus Sheffer, Aug 21, 2014, 10:18 am |
|
Glazing ratioNC-2009 EAp2: Minimum Energy Performanceposted by CT G on Aug 20, 2014, 4:59 pm
We are working with a building that has 9 floors, the first 6 floors are for parking, unconditioned naturally ventilated with no glass on the envelope, and the last 3 are conditioned office... Last reply: Marcus Sheffer, Aug 21, 2014, 10:03 am |
|
Baseline HVAC system exceptionsNC-2009 EAp2: Minimum Energy Performanceposted by Ritwik Kakati on Aug 20, 2014, 3:22 pm
I modeled a 10-story hotel building. Since the majority of space are hotel rooms, which are considered to be Residential spaces, the primary Baseline HVAC system type is System #1. Of course,... Last reply: Marcus Sheffer, Aug 20, 2014, 5:29 pm |
|
RTS method- TFM method- CLTD/CFM methodNC-2009 EAp2: Minimum Energy Performanceposted by Rudolph Carneiro on Aug 19, 2014, 7:56 pm
Can someone tell me if current simulation software (IES, Energy Plus or even HAP) uses any of the following methods in its calcs? 1. TFM – Transfer Function Method Last reply: Matt Scott, Aug 20, 2014, 11:04 am |