LEED NC 2009 for factory buildings

NC-2009 EAp2: Minimum Energy Performance
posted by Rathnashree Bharadwaj on Aug 13, 2014, 2:29 am

The project is a manufacturing facility with ancillary buildings such as admin, health centre, canteen, utility and security blocks. The buildings are not physically connected to each other. Do...

Last reply: Marcus Sheffer, Sep 2, 2014, 10:25 am

Energy Modeling for Casino

NC-2009 EAp2: Minimum Energy Performance
posted by Chris Hammett on Aug 28, 2014, 5:40 pm

Hello. I am working on the energy model for a casino/hotel/nightclub. I have been contracted only to develop the model, no input in regards to design. I have built the entire model in Energy Pro...

Last reply: Marcus Sheffer, Aug 28, 2014, 7:46 pm

Baseline Fan Power Heat Recovery

NC-2009 EAp2: Minimum Energy Performance
posted by Matt Scott on Aug 27, 2014, 5:26 pm

to a different discussion forum. You should not sum the static pressures. Log in or register to post comments Matt Scott Engineer N.E. Fisher & Associates, Inc. LEEDuser Basic Member 18 thumbs up August 28,...

Last reply: Marcus Sheffer, Aug 28, 2014, 2:05 pm

Motor Power

NC-2009 EAp2: Minimum Energy Performance
posted by Omar Elrawy on Aug 26, 2014, 4:59 am

Dear All,
For modelling pumps for my Proposed design, I have a manufacturer's datasheet for a Variable speed pump (Secondary pump) with the following values:

Duty Flow...

Last reply: Marcus Sheffer, Aug 26, 2014, 9:34 am

Old HVAC equipment transferred from other site

NC-2009 EAp2: Minimum Energy Performance
posted by Yastimy Jupson on Aug 21, 2014, 7:12 am

Hello,

I have a new factory project recently. The owner wants to transferred old HVAC equipment from their old factory to this new factory. Do these old HVAC equipment transferred from...

Last reply: Marcus Sheffer, Aug 26, 2014, 9:30 am

Modeling a humidifier in the baseline case

NC-2009 EAp2: Minimum Energy Performance
posted by Gustav Alfaro on Aug 11, 2014, 1:31 am

Hi, I am working on a data center project under NC 2009. For the proposed case we have self-contained steam electric humidifiers that are an accessory for the CRAH units; the question is if those...

Last reply: Marcus Sheffer, Aug 21, 2014, 4:48 pm

Parking Garages Abutting Conditioned Space

NC-2009 EAp2: Minimum Energy Performance
posted by Jon Clifford on Aug 21, 2014, 9:38 am

While we are on the topic of parking garages, I have had projects where a parking garage abutted a conditioned building. Reviewers have treated them differently.

During the review of one...

Last reply: Marcus Sheffer, Aug 21, 2014, 10:18 am

Glazing ratio

NC-2009 EAp2: Minimum Energy Performance
posted by CT G on Aug 20, 2014, 4:59 pm

We are working with a building that has 9 floors, the first 6 floors are for parking, unconditioned naturally ventilated with no glass on the envelope, and the last 3 are conditioned office...

Last reply: Marcus Sheffer, Aug 21, 2014, 10:03 am

Baseline HVAC system exceptions

NC-2009 EAp2: Minimum Energy Performance
posted by Ritwik Kakati on Aug 20, 2014, 3:22 pm

I modeled a 10-story hotel building. Since the majority of space are hotel rooms, which are considered to be Residential spaces, the primary Baseline HVAC system type is System #1. Of course,...

Last reply: Marcus Sheffer, Aug 20, 2014, 5:29 pm

RTS method- TFM method- CLTD/CFM method

NC-2009 EAp2: Minimum Energy Performance
posted by Rudolph Carneiro on Aug 19, 2014, 7:56 pm

Can someone tell me if current simulation software (IES, Energy Plus or even HAP) uses any of the following methods in its calcs?

1. TFM – Transfer Function Method
2. RTS – Radiant...

Last reply: Matt Scott, Aug 20, 2014, 11:04 am