Target Finder

NC-2009 EAp2: Minimum Energy Performance
posted by Guillermo T. Adamo on Oct 31, 2011, 6:57 pm

We are working on a fueling station located in Buenos Aires, Argentina. The form on leed on-line requires filling up the target finder in the Energy star website. The problem is that we are being...

Last reply: Marcus Sheffer, Nov 1, 2011, 10:54 am

Baseline Model Exterior Lighting

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Oct 31, 2011, 2:48 am

Okay, the baseline model has no overhangs and canopies, but the design has. As per my reviewer comments, I can't take credit for lighting parts of the baseline model (like the facade) if this...

Last reply: Jean Marais, Nov 1, 2011, 2:00 am

Using PHPP for EAp2/EAc1 modeling

NC-2009 EAp2: Minimum Energy Performance
posted by Lyle Axelarris on Oct 24, 2011, 4:53 pm

Is it possible to use PHPP software (Passive House Planning Package) for energy modeling on a LEED-NC project? Does anyone have experience with this?
Would an alternative compliance path...

Last reply: David Posada, Oct 27, 2011, 2:43 pm

Adding additional Exhaust Fans in proposed model

NC-2009 EAp2: Minimum Energy Performance
posted by Santiago Rodriguez on Oct 26, 2011, 2:50 pm

Hello, I am wondering if it is allowed to add additional exhaust fans into the proposed model to extract more hot air from the zone and save more energy on cooling. Is this possible? The zone I...

Last reply: Christopher Schaffner, Oct 26, 2011, 3:13 pm

EA p2 Section 1.4.xls

NC-2009 EAp2: Minimum Energy Performance
posted by Sari Kujawa on Aug 12, 2011, 3:21 pm

First time submitting NC 2009 V3 forms. Filling out the EAp2 Section 1.4. xls file. - Seems so redundant to have to fill out this excel form, when all the data can be found in the output files...

Last reply: Christopher Schaffner, Oct 26, 2011, 2:26 pm

EAp2- Energy Modelling and Process Loads

NC-2009 EAp2: Minimum Energy Performance
posted by Marcio Alberto Casado Pereira on Oct 17, 2011, 11:46 am

Hi,

I am working on a project (Stadium) where the only significative improvement on energy performance is lighting because the COP of the HVAC is basically the same and the envelope is...

Last reply: Marcio Alberto Casado Pereira, Oct 17, 2011, 12:50 pm

EAp2-Natural Ventilation v/s No HVAC

NC-2009 EAp2: Minimum Energy Performance
posted by Marcio Alberto Casado Pereira on Oct 13, 2011, 9:21 am

I am trying to determine if a project of an Industry ( "New Construction") without HVAC system get some special credit or if it is possible to obtain the 10% improvement between Baseline and...

Last reply: Marcus Sheffer, Oct 13, 2011, 2:45 pm

Automatic Lighting Shut-off in Hotel Guest rooms

NC-2009 EAp2: Minimum Energy Performance
posted by Arub Vijay on Oct 11, 2011, 7:20 am

I have a hotel building with 150 keys aiming for LEED Silver..can anybody advise if all the guest rooms shall have automatic lighting shut-off controls (occupancy sensors, key/card controlled etc...

Last reply: Marcus Sheffer, Oct 12, 2011, 9:15 am

What if there's no A/C.

NC-2009 EAp2: Minimum Energy Performance
posted by Patana Rattananavathong on Oct 6, 2011, 11:21 pm

What if the project don't have any A/C? there are 3 retails, 1 wc. All are separated buildings. What should I do with ASHRAE 5.4, 6.4 and for energy simulation?

Last reply: Marcus Sheffer, Oct 10, 2011, 12:09 pm

LEED Project boundary and EAp2, EAc1

NC-2009 EAp2: Minimum Energy Performance
posted by Kim Sosalla-Bahr on Oct 4, 2011, 12:22 pm

The project is a new facility, which has a new construction and renovation component. The new building is 6 stories tall, adjacent to an existing 3 story plus roof deck building. In our project...

Last reply: Marcus Sheffer, Oct 10, 2011, 11:50 am