Mechanical Ventilation in some areas of buildingNC-2009 EAp2: Minimum Energy Performanceposted by Santiago Rodriguez on Mar 5, 2012, 3:45 pm
Hello, I have the following doubt: Suppose that a building has an HVAC system designed for all office and working areas, but for the restrooms and locker rooms, which are occupied every... Last reply: Marcus Sheffer, Mar 13, 2012, 8:46 am |
|
LPD for space types not listed on ASHRAE TableNC-2009 EAp2: Minimum Energy Performanceposted by Xun Jia on Mar 7, 2012, 10:54 am
Does anyone know how the baseline Lighting Power Density should be set up if the space type is not listed on Table 9.6.1 of ASHRAE 90.1 using Space-by-space method? For example,... Last reply: Marcus Sheffer, Mar 7, 2012, 12:06 pm |
|
EAp2 Required SignatoriesNC-2009 EAp2: Minimum Energy Performanceposted by Bob Korp on Mar 5, 2012, 5:18 pm
Two project engineers have completed the sign-off task, but a 3rd has been unable to use LEED ON-LINE despite my efforts to provide remote assistance. An earlier thread states "If the project... Last reply: Marcus Sheffer, Mar 5, 2012, 5:43 pm |
|
Cove lighting as decorative?NC-2009 EAp2: Minimum Energy Performanceposted by Orlin Velinov, PE on Feb 29, 2012, 5:42 pm
Has anybody used the ASHRAE 9.6.2 Additional Interior Lighting Power allowance for cove lighting. We have a hotel project where in the common areas we have down lights and cove lighting, both... Last reply: Marcus Sheffer, Mar 2, 2012, 8:21 am |
|
stairs, electrical rooms modeled?NC-2009 EAp2: Minimum Energy Performanceposted by AAME User on Feb 29, 2012, 10:08 am
A couple of quick reference questions: 1) I have some miscellaneous areas in my project (stairwells, electrical rooms, elevator equipment room) being served by split system AC units and 4-... Last reply: Marcus Sheffer, Mar 1, 2012, 8:17 am |
|
Motor Efficiencies for projects outside the USNC-2009 EAp2: Minimum Energy Performanceposted by eirini matsouki on Feb 6, 2012, 1:45 pm
I was wondering whether anyone has come across the motor efficiency issue for projects outside the US. We have a project in EU and the motor efficiencies are different to the ones shown on 90.1... Last reply: Christopher Schaffner, Mar 1, 2012, 8:16 am |
|
High price differences between electricity and fossil fuelNC-2009 EAp2: Minimum Energy Performanceposted by Hélène Vieillefosse on Feb 9, 2012, 6:02 am
In our building, fossil fuel is 30 time less expensive than electricity. And as we use fossil fuel and electricity for heating (mainly fossil fuel but we need a little bit of electricity), in the... Last reply: Christopher Schaffner, Mar 1, 2012, 8:15 am |
|
Baseline HVAC SelectionNC-2009 EAp2: Minimum Energy Performanceposted by April Rice on Feb 29, 2012, 5:40 pm
We have a 5 story non-residential building (located on a campus), with a mechanical penthouse (with roof) above. We are trying to determine if this would be a 6 story building versus a 5 story... Last reply: Christopher Schaffner, Mar 1, 2012, 7:58 am |
|
District Cooling for Humidity ControlNC-2009 EAp2: Minimum Energy Performanceposted by Santiago Rodriguez on Feb 28, 2012, 11:04 am
I am working in a project that has no heating or cooling system, therefore I used the same HVAC system as in the proposed model (system #4: PSZ-HP). The reviewers found that the humidity levels... Last reply: Marcus Sheffer, Feb 28, 2012, 4:51 pm |
|
ASHRAE 90.1-Envelope Fenestration & Skylight Fenestration areaNC-2009 EAp2: Minimum Energy Performanceposted by Natalie Tan on Feb 24, 2012, 4:37 pm