We are working on a stadiumNC-2009 EAp2: Minimum Energy Performanceposted by Carolina Vergnano on Jun 11, 2012, 2:13 pm
We are working on a stadium Project, where the item 9.4.1.1 (Automatic Lighting Shutoff) of ASHRAE 90.1-2007 is being complied for most of the areas, which represents more than 90% of the project... Last reply: Marcus Sheffer, Jun 11, 2012, 3:46 pm |
|
9.4.1.2 (Space Control)NC-2009 EAp2: Minimum Energy Performanceposted by Carolina Vergnano on Jun 11, 2012, 2:10 pm
In the item 9.4.1.2 (Space Control) of ASHRAE 90.1-2007, it is not clear if the lights of the classrooms/conference/meeting/break rooms have to be controlled only by occupancy sensors controls.... Last reply: Marcus Sheffer, Jun 11, 2012, 3:29 pm |
|
Heat Recovery wheelNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 9, 2012, 1:18 am9:54 am The best place to post software specific questions is the eQUEST discussion forum found on onebuilding.org There is extensive discussion in the archive on this subject. First question-... Last reply: Marcus Sheffer, Jun 11, 2012, 10:13 am |
|
multiple buildings energy modelingNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 11, 2012, 12:55 am
My project consist of a mixed used tower (G+52 floors) and 2 detached building ( be fed from the same cooling and heating system ) but they are core and shell and I m persuing LEED NC 2009... Last reply: Marcus Sheffer, Jun 11, 2012, 9:22 am |
|
3 types of glass in the proposed designNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 8, 2012, 8:20 am
In the building we are modeling 3 tyes pf glass (3 different U values and SC) are used by the architect.Is it acceptable for EAP2 that I do the following: Last reply: Marcus Sheffer, Jun 8, 2012, 11:42 am |
|
Baseline Fan Power: Systems 6 and 8 ASHRAE 90.1-2007 Appendix GNC-2009 EAp2: Minimum Energy Performanceposted by TOMAS URIBE on Jun 5, 2012, 1:04 pm
If our Baseline building design HVAC system is ASHRAE’s #6 or #8 (according to TABLE G3.1.1B). Do we have to calculate and simulate both, fan power according to section G3.1.2.9 (System Fan Power... Last reply: Marcus Sheffer, Jun 7, 2012, 5:45 pm |
|
fit out workNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 6, 2012, 4:44 am
Part of my project is considered as fit out which means that there are some office floors where the area is divided into offices and to each office a chilled water tap point is provided is air... Last reply: Marcus Sheffer, Jun 7, 2012, 5:43 pm |
|
Dormitory LPDNC-2009 EAp2: Minimum Energy Performanceposted by Rebekah Burke on Jun 7, 2012, 11:21 am
We have a 4 story college dormatory building, 113,000 SF. Originally we used the building area method, ASHRAE 90.1-2007 table 9-B allowed for dormitories (1.0W/SF), to determine the W/SF for the... Last reply: Marcus Sheffer, Jun 7, 2012, 5:37 pm |
|
technical floorNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 5, 2012, 7:28 am
In the building we are modeling there are some technical floor among conditioned floors for example between the 9th and the 11 th floor which are conditioned there is a tehcnical floor which is... Last reply: Erin Adkins, Jun 5, 2012, 9:26 am |
|
Multiple Use Highrise Baseline Building(s)NC-2009 EAp2: Minimum Energy Performanceposted by Wes Lawson on May 8, 2012, 10:27 am
Hello, The predominant use of this building is residential. The... Last reply: sasa weee, Jun 4, 2012, 2:15 pm |