CS projects should have 75% of GFA to earn this credit?
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by Bazeeth Ahamed Khader Mohamed Ali on
75% of "leasable area" makes more sense here. How do we communicate our suggestions to USGBC. Kindly let me know if there is a way.
Industrial Plant Manufacturing Hall Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sustainability Provider on
We are currently working on the design of an industrial plant (aluminum casting in specifics) with two sections - manufacturing hall and administrative/engineering offices.
New LEED CI Project information form
posted by Susann Geithner on
We have just started a new LEED CI project on LEED Online.
Energy Star Space Allocation
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Ed Okon on
Good Afternoon I'm currently composing a plan for LEED EB on an existing manufacturing campus comprised of multiple building types (warehouse, shipping and receiving facility, manufacturing, office
Sample Calculations
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Craig Phillips on
I am finding it hard to locate a 1.0 or a dual flush 1.6/.8 toilet and flushometer. Where did the data come from in the sample calculations? Lyn
WEp1 - Annual Days of Operation
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by susan eguia on
Hi, Can someone please clarify what is the LEED definition for annual days of operation - is it no. of building operated in a year? Appreciate any assistance. Thanks, Susan
Off site water storage
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Prudence Ferreira on
Our project site is a winery that directs stormwater to ponds which are later used for irrigation. The only thing is that the ponds are sometimes considerably distant from the LEED building.
Tobie, yes, you'll need to
posted by Tristan Roberts on
Tobie, yes, you'll need to meet them.
Building footprint
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by MARIA GARCIA on
Hi all, I have read your definition of building footprint (Building footprint is the area on a project site used by the building structure, defined by the perimeter of the building plan.
Areas between PV panels and mech equipment
NC-2009 SSc7.2:Heat Island Effect—Roofposted by R Jones on
I see that there are rulings about not including roof area which is covered in PV or mechanical equipment. Q: does this go as far as determining that the space between panels ( allowing for reason