Forum quick links
LEED O+M
CI-v4 LTc1:LEED for neighborhood development locationposted by DAVE LI on
If the project that is expected to be CI certified has already obtained LEED V4 O+M Platinum certification, can it be obtained point?
submission of architectural plans
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by Sareet Benayahu on
hi,
in general for LEED ND-Plan, must the architectural plans submitted for LEED review be approved by local councils already or may they be still in the planning stage?
Alternative method to comply with Parking Garage Lighting Control Requirement (ASHRAE 90.1)
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
According to ASHRAE Standard 90.1-2010 <mandatory prescription 9.4.1.3 Parking Garage Lighting Control>, “lighting shall be controlled by one or more devices that automatically reduce lightin
Written commitment for Ergonomics program clarification
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Kristen Magnuson on
I have a question about the following requirement for this pilot credit:
LEED Online Form Requirements
CI-v4 MRp2:Construction and demolition waste management planningposted by Marcia Weekes on
I am a bit confused by the information that is being requested at the top of on the LEED Online form associated with this prerequisite.
Garage Demand Control Ventilation
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
If attempting to make use of LI 10371 for garage demand control ventilation how should the proposed model be differentiated from baseline to take advantage of CO sensors?
Cooling Tower drift eliminator - standards for processes
NC-v4 WEp2:Indoor water use reductionposted by Dionisio Franca on
We checked the drift eliminator specs with the manufacturer selected for our project and they told us that that their draft eliminators reduce drift to 0.05% only.
100% of Waste to RCI Hauler
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Kristina Bach on
We ran into a couple of questions with this credit for a project that used two haulers - one was RCI-certified and one was not.
Using "Informing Design Using Triple Bottom Line Analysis" Pilot Credit for a HC 2009 project
Pilot-Credits SSpc113:Informing Design Using Triple Bottom Line Analysisposted by Megan Leslie on
I just went through the process of using Autocase to document this credit for a Hospital project using the LEED 2009 for Healthcare: New Construction rating system. There were a few inst
IEQ 0 VOC General Emissions Test Needed?
NC-v4 EQc2:Low emitting materialsposted by Jenelle Shapiro on
If any wet applied product is shown to have 0 VOCs, does it still need a general emissions evaluation?