Forum quick links
LEED V4.1 EBO+M Minimum Program Requirements
posted by Ben McEwen on
I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 do
Existing Building Fire Escapes - Building Square-footage
NC-2009 PIf2:Project Summary Detailsposted by Katherine Norris on
Our existing building relies on (2) metal fire escapes for emergency egress that we are not modifying. They are full exterior, self supported, and only connect to the building with later
LVR wood stain and concrete sealer
CI-v4 EQc6:Interior lightingposted by Sue Bryant on
How do you find the LVR for these products?
EDI folder
posted by Paula Melton on
We have started a folder on Equity, Diversity, and Inclusion in this forum.
Converting from paper record keeping to electronic record keeping
EBOM-v4.1 INc1:Innovationposted by Jeffery Moore on
Hello,
Gray water for irrigation
posted by Hoda Ibrahim on
Our project have external gray water for irrigation so we don’t have to treat water on site
Can I consider option 2 for 100% reduction or not?
Waste Management Coordinator
NC-v4 MRp2:Construction and demolition waste management planningposted by Akshay Padwal on
The person (program manager) who is coordinating waste management, do they have to be LEED certified?
Location and Transportation - option 2: Diverse uses
posted by Ricardo Filho on
Hi all;
I have a question on the Location and Transportation credit, more specifically on the topic of the Diverse use:
the User guide says:
Requirements for "Ongoing Feedback Mechanism"?
CI-v4 IPc1:Integrative processposted by Renee Shirey on
The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,