Topic | Recent |
---|---|
Example 2 in ref guideNC-2009 SSc6.1: Stormwater design - quantity controlposted by Adrienn Gelesz on Jun 4, 2014, 12:14 pm
Hi, there has been some previous discussion in this topic, but no definite answer has been given. Example 2 in the ref. guide uses 1" storm, referring to it as 90% of the average rainfall event.... Last reply: Michael DeVuono, Jun 4, 2014, 1:03 pm |
|
1-year and 2-year 24-hour Design StormNC-2009 SSc6.1: Stormwater design - quantity controlposted by Liubov Melnikova on Feb 25, 2013, 3:44 am
Michael DeVuono, Last reply: Francesco Allaix, Apr 1, 2014, 4:10 am |
|
run off coefficientNC-2009 SSc6.1: Stormwater design - quantity controlposted by Jin Park on Mar 21, 2014, 1:02 am
Hi My project site is composed of sand,gravel. Last reply: Michael DeVuono, Mar 21, 2014, 8:19 am |
|
Stormwater runoff in the roofNC-2009 SSc6.1: Stormwater design - quantity controlposted by Fabio Frescia on Jun 28, 2010, 6:10 am
Dear all, Our project design stormwater combine 2 options: Last reply: Yoyo Shek, Mar 12, 2014, 9:48 pm |
|
NC 2009- SSc6.1 Storwater Quantity Acceptable MethodsNC-2009 SSc6.1: Stormwater design - quantity controlposted by LUCY WILLIAMS on Oct 18, 2010, 8:09 pm
Has anyone ever utilized a bio-retention basin with an underdrain that eventually slowly releases the filtered runoff and discharges to a stormdrain system instead of infiltrating naturally to... Last reply: Michael DeVuono, Mar 10, 2014, 9:31 am |
|
System manages the 1:5 and 1:100 year event- compliant?NC-2009 SSc6.1: Stormwater design - quantity controlposted by Lindsey Kindrat on Feb 25, 2014, 1:58 pm
In my region, the DP requires that the major storm system be designed to convey runoff from the 1:100yr event (and minor system to convey the 1:5yr event). Acknowledging that 1:100yr is a... Last reply: Michael DeVuono, Feb 26, 2014, 8:49 am |
|
Blue RoofNC-2009 SSc6.1: Stormwater design - quantity controlposted by Jamison Hill on Jan 23, 2014, 5:02 pm
As part of NYC's blue roof requirement, roofs must provide 24 hour detention detention for the 2-yr design storm and an equivalent peak runoff rate equal to a curve # of approx 50 for projects... Last reply: Michael DeVuono, Jan 23, 2014, 5:40 pm |
|
Option 2 Percentile Rainfall EventNC-2009 SSc6.1: Stormwater design - quantity controlposted by Jason Cocek on Jan 17, 2014, 12:11 pm
I am trying to document a project under option 2 for this credit for a... Last reply: Michael DeVuono, Jan 17, 2014, 12:35 pm |
|
Equation 1. Volume of Captured RunoffNC-2009 SSc6.1: Stormwater design - quantity controlposted by Ahmed Mosa on Jan 15, 2014, 8:13 am
Why is equation 1 divided by 12" ? Vr=(P.Rv.A)/12" Last reply: Michael DeVuono, Jan 15, 2014, 8:35 am |
|
Run-off calculations for a site with future extensionsNC-2009 SSc6.1: Stormwater design - quantity controlposted by Valentin Grimaud on Dec 19, 2013, 12:10 pm
Dear community, We certify a project that will have two extensions in the future. Because of this we cannot earn crédits SSc5.1 and SSc5.2 as per the MPR. But I was wondering if this is... Last reply: Valentin Grimaud, Dec 26, 2013, 11:33 am |