Forum quick links
Grouping of spaces
CS-2009 IEQp1:Minimum IAQ Performanceposted by Anupam Jain on
I am working on a project with similar spaces repeating on each floor. I know LEED allows one to group spaces in some credits.
Accumulating Annexes in multi
posted by Paola Figueiredo, Newton Figueiredo on
The credits seem to be accumulating annexes, for example, after uploading an annex in the templates for the SS 4.1 credit, it appears later in the following credits as an upload, even for templates
Can a PC count for Campus?
Pilot-Credits PC41:Wastewater Managementposted by Prudence Ferreira on
If we were to certify a campus EBOM project and we pursued this credit for a campus wastewater treatment facility would this PC gain a point for each building that used the wastewater treatment cen
AASHE STARS / Climate Action Plan - Master Site Innovation
NC-2009 IDc1:Innovation in Designposted by M. Elbaum on
Any thoughts if an AASHE STARS rating for a college campus will earn you a Master Site Innovation credit? What about being an ACUPCC signatory and having a Climate Action Plan? These would be two
contact GBCI
posted by Tristan Roberts on
Is this for LEED registration or certification via LEED Online? Please use the "feedback" link on LEEDOnline.com to contact GBCI for help with this.
Weighted average for new construction + major renovation?
NC-2009 EAc1:Optimize Energy Performanceposted by Bethany Beers on
We are performing a review of an energy model for a project that is a major remodel of an existing space with addition of new square footage.
A & B bus lines - do they count separately?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jill Ziegler on
We are going for Exemplary Performance since we have 5 qualifying bus lines. Total (weekday) stops equals exactly 200, so we're good there.
Phase I for an Existing School
Schools-2009 SSp2:Environmental Site Assessmentposted by John McFarland on
Do we need a formal Phase I assessment for a school remodeling project (major renovation)? The school site was a greenfield site when it was originally constructed approximately 50 years ago.
Compliance if there are no fixtures on the design
CS-2009 WEc3:Water Use Reductionposted by Jose Salinas on
Hi, The Owner is constructing a tower with high end tenants on the his scope.
Cost of Renewable Energy
NC-2009 EAc1:Optimize Energy Performanceposted by Gregg Achtenhagen on
I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.