Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Grouping of spaces

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Anupam Jain  on 

I am working on a project with similar spaces repeating on each floor. I know LEED allows one to group spaces in some credits.

1
Thu Aug 4, 2011, 11:56 am

Accumulating Annexes in multi

Living with LEED Online - quirks, bugs and hiccups
posted by  Paola Figueiredo, Newton Figueiredo  on 

The credits seem to be accumulating annexes, for example, after uploading an annex in the templates for the SS 4.1 credit, it appears later in the following credits as an upload, even for templates

0

Can a PC count for Campus?

Pilot-Credits PC41:Wastewater Management
posted by  Prudence Ferreira  on 

If we were to certify a campus EBOM project and we pursued this credit for a campus wastewater treatment facility would this PC gain a point for each building that used the wastewater treatment cen

1
Wed May 25, 2011, 4:59 pm

AASHE STARS / Climate Action Plan - Master Site Innovation

NC-2009 IDc1:Innovation in Design
posted by  M. Elbaum  on 

Any thoughts if an AASHE STARS rating for a college campus will earn you a Master Site Innovation credit? What about being an ACUPCC signatory and having a Climate Action Plan? These would be two

1
Wed Jan 2, 2013, 7:01 pm

contact GBCI

General forums
posted by  Tristan Roberts  on 

Is this for LEED registration or certification via LEED Online? Please use the "feedback" link on LEEDOnline.com to contact GBCI for help with this.

1
Wed May 25, 2011, 4:37 am

Weighted average for new construction + major renovation?

NC-2009 EAc1:Optimize Energy Performance
posted by  Bethany Beers  on 

We are performing a review of an energy model for a project that is a major remodel of an existing space with addition of new square footage.

1
Tue May 31, 2011, 2:05 pm

A & B bus lines - do they count separately?

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Jill Ziegler  on 

We are going for Exemplary Performance since we have 5 qualifying bus lines. Total (weekday) stops equals exactly 200, so we're good there.

1
Mon Jun 6, 2011, 6:00 pm

Phase I for an Existing School

Schools-2009 SSp2:Environmental Site Assessment
posted by  John McFarland  on 

Do we need a formal Phase I assessment for a school remodeling project (major renovation)? The school site was a greenfield site when it was originally constructed approximately 50 years ago.

1
Thu Jun 2, 2011, 3:31 pm

Compliance if there are no fixtures on the design

CS-2009 WEc3:Water Use Reduction
posted by  Jose Salinas  on 

Hi, The Owner is constructing a tower with high end tenants on the his scope.

1
Thu Jul 28, 2011, 4:43 am

Cost of Renewable Energy

NC-2009 EAc1:Optimize Energy Performance
posted by  Gregg Achtenhagen  on 

I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.

1
Thu Sep 8, 2011, 5:25 pm