Perimeter ControlsNC-2009 SSp1: Construction Activity Pollution Preventionposted by Gabriela Mesquita on Oct 30, 2014, 1:29 pm
Good day I want to consult in relation to a project in a lot of 10 hectares (about 25 acres) with a perimeter of 1377 m (about 4500 ft). One of the longer sides of the perimeter has input waters... Last reply: Michael DeVuono, Jan 14, 2015, 2:23 pm |
|
LEED Boundary / Silt FencingNC-2009 SSp1: Construction Activity Pollution Preventionposted by Carrie Laurendine on Dec 30, 2014, 6:02 pm
Currently working on a project that is a large site with an existing building currently on the site. The new LEED building is away from this current building creating a smaller LEED Boundary than... Last reply: Carrie Laurendine, Jan 14, 2015, 1:04 pm |
|
Checking ESC plan at design stage?NC-2009 SSp1: Construction Activity Pollution Preventionposted by Hrvoje Kvasnicka on Dec 17, 2014, 6:54 am
Hi All Last reply: Hrvoje Kvasnicka, Dec 31, 2014, 3:03 am |
|
Previously developed or graded landNC-2009 SSp1: Construction Activity Pollution Preventionposted by SoYoung Lee on Dec 15, 2014, 12:37 am
We are planning to pursue LEED certification for the official buildings. The site areas are being developed for those municipal buildings relocation and as part of the urban redevelopment (or,... |
|
Job Specific Environment AnalysisNC-2009 SSp1: Construction Activity Pollution Preventionposted by Yodi Danusastro on Dec 12, 2014, 2:58 am
Does anyone has the template of JSEA? I've been ask to create... |
|
SSp1 and EPA in KSANC-2009 SSp1: Construction Activity Pollution Preventionposted by FABIO VIERO on Dec 3, 2014, 5:46 am
We are working on two projects located in Saudi Arabia under LEED 2009 certification. We are looking for finding the appropriate measures to be applied, as per EPA’s... |
|
Zero lot line existing building renovationNC-2009 SSp1: Construction Activity Pollution Preventionposted by Kim Shinn on Jun 13, 2012, 5:05 pm
This project is a re-skin, and interior re-fit. Complete preservation of the... Last reply: Michael DeVuono, Oct 17, 2014, 12:19 pm |
|
Sediment BasinNC-2009 SSp1: Construction Activity Pollution Preventionposted by Paula Hernandez on Oct 16, 2014, 10:32 am
Hello again, we are working on a project for which we are installing a sediment basin. According to EPA we could use the calculation of 3600 ft3 / acre drained to size it. Most of the drainage... Last reply: Paula Hernandez, Oct 16, 2014, 11:17 am |
|
In which construction phase can I certify my building?NC-2009 SSp1: Construction Activity Pollution Preventionposted by Hazem Yusuf on May 4, 2014, 5:24 am
Construction phase of an office building is consisting of multi stages. Those stages are including but not limited to; excavation stage, concrete skeleton stage, block work and plastering stage,... Last reply: Mario S., Oct 15, 2014, 4:25 am |
|
Concrete WashoutNC-2009 SSp1: Construction Activity Pollution Preventionposted by Paula Hernandez on Oct 6, 2014, 6:52 am
Hello everyone, we are working on a project in an estate, part of this estate is the current LEED project, with its own LEED boundary. The estate has many projects going on and the... Last reply: Paula Hernandez, Oct 6, 2014, 8:00 am |