Forum quick links
M&V data reporting
NC-2009 EAc5:Measurement and Verificationposted by Joseph Greene on
Please verify the reporting period is 1 year and not 2. Your sample M&V plan talks about a two year M&V period. Are templates available for data reporting and is there a required format?
Option 2: Restrictions?
CI-2009 SSc1:Site Selectionposted by on
Our project has a campus designed for 5 buildings. One building and the entire site was built out and received LEED Certified in 2004.
Biomass Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by sara frye on
Our project, a small non-profit farm house renovation, is using a wood fired biomass boiler.
SLL Prerequisite 3 HELP!!!
posted by Roger Moquin on
I have a lot of trouble with that prerequisite. Our project is in Canada and there is water everywhere here!!! First, we have a little water body in border of the road near our project.
Credit 3.2, Option 1, Path 2
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Douglas Blakeslee on
We are the GC for a new small (4,000 SF) Leed Certified fast food restaurant with 3,800 CFM of outside air when occupied. We plan to do our initial 3,500 CF/SF flushout over a weekend.
Phased IAQ Testing?
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Q + on
Is it acceptable to perform air quality testing in phases? The project in question is a 175K sf school designed in 7 zones.
IAQ Testing and Furnishings
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Q + on
The Credit Language contains this statement regarding air quality testing and furnishings: "Movable furnishings such as workstations and partitions should be in place for the testing, although it
Usage and days of operation
posted by MARIO DE JESUS CARMONA VINAS on
Christopher, I have the same problem, were you able to fix it?
Supervising the Commissioning of 20% of the energy systems
NC-2009 EAc3:Enhanced Commissioningposted by Maya Karkour on
Hello, We are working on a project in which all the energy systems will be installed, tested and balanced by the general contractor.
Emission Reporting using Energy Star
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Simon Sue on
When i click on the "select view" then to Performance :GHG emission, i can see the current total GHG emission value, but when i try to generate SEP (Statement of Energy Performance) report, the GH