Forum quick links
Conducting Survey: Mid-Week OK?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Wendy Lao on
SSc4 requires the survey to be conducted either (1) each day over 5 consecutive workdays) or (2) at the conclusion of 5 consecutive workdays.
Mixing Solar PV, LED Lighting and LEED GA Accreditation
posted by Daniel Valdes on
Hi, I recently received my accreditation as a Green Associate. I'm currently working in Solar PV & LED Lighting company that does consulting, design and installation of these systems.
projected Perlite
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Emmanuel Pauwels on
We are using projected perlite on the inside of the building as a fire-resitance.
Identifying the Baseline Areas
NC-2009 WEc1:Water Efficient Landscapingposted by Maya Karkour on
Dear All, I want to double check on how to allocate the Baseline areas for my project. My proposed project has 100 sq.m of trees, 300 sq.m of shrubs, and only 5 sq.m of turf grass. Shall I alloc
excluding part of the site from the LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ann Plautz on
I am working on a project where the LEED Boundary had already been set prior to my participation. The project is a Streetcar Vehicle maintenance facility owned on a City block owned by a City.
10 cfm per person rule
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Jay Murray on
I have a small tenant space in a large high rise commercial building.
Example confusion in Ref Guide
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Lorne Mlotek on
On page 367 example 1 The carpet meets the extended producer responsibility criteria which should count 50% of its value - but the entire 100% is counted. Which is correct?
Method 3 Measurement for Hotel Guest Villas
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by John Covello on
I have a couple of questions: We have a hotel project with 80 villas that are grouped into building blocks of 4 and 6.
Compliance still says "N".....please help
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Joe Sechler on
I've filled this entire form out checking "in scope" for the first section, "zero CFC refrigerants" for the second section and a narrative that reads "Each new rooftop (Daikin RPE) are factory ship
Ceiling Tiles
NC-2009 EAc1:Optimize Energy Performanceposted by Christina Contreras on
We are currently building a school and one of our subcontractors asked if ceiling tiles count towards Energy and Atmosphere Credit 1?