Forum quick links
Ground source water loop required District Cooling guidance?
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
We would like to ask something regarding a comment from a reviewer for EAc1, this is a rather vague comment in our view.
EA c1.2 form Space types
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Michael Archer on
I was wondering why the EA c1.2 form doesn't include an option for Private Office under the Space Types column? Are we to assume all office type spaces are to be categorized as Shared Office?
Calculation
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Fabien Challeat on
Hi, Our project has several buildings going for LEED certification. We are using 2 different roofing materials with SRI of 106 and 84 for low slope roofs. Total roof area for all 7 buildings is 9
Underground floors...
NC-2009 PIf2:Project Summary Detailsposted by Marcin Gawronski on
We are currently assessing office building which has 2 underground floors. On level -2 there are only: parking, storage, mechanical rooms etc.
Hello, regarding my previous
NC-2009 EAc2:On-Site Renewable Energyposted by Gabriele Polenta on
Hello, regarding my previous post I have one more doubt: having the building with a biomass system, in EAc1 when calculating the thermal energy do I have to use the local gas cost or the local biom
biking line
Pilot-Credits PC14:Walkable Streetsposted by Lily Li on
The building is parallel to the street, cross street it's a biking line, can this still count towards the credit, please advise.
Undeveloped vs. Greenfield
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Michelle Rosenberger on
One of our warehouse projects is the fifth phase of an existing development.
CO2 sensors in duct work
Schools-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Todd Bundren on
The mechanical engineer who designed our heating / cooling system placed the CO2 sensors for the gymnasium (with bleachers) in the return ducts.
Baseline of NPDc8
ND-v2009 NPDc8:Transportation demand managementposted by Jie Xiong on
Hi For this credit, it says that create a TDM program for the project to reduce 20% at least weekday peak-period motor vehicle trips compared with a baseline case. So what is the baseline case?
Hopefully A New Direction
posted by Marcus Sheffer on
Very interesting to hear about your new endeavor Jerry. Hopefully GG can become a positive force in the green building market. It certainly has some very positive features.