Forum quick links
EAc1 ASHRAE 90.1-2007 Energy Simulation Model
NC-2009 EAc1:Optimize Energy Performanceposted by Denise Newbould on
Can someone tell me how difficult this modeling software is to use, and how long would it take an engineer who isn’t already familiar with it to get up to speed?
Prerequisite at risk!
posted by Alicja Bieszyńska on
We have just received the Preliminary Design Submittal Review for our project.
IEQp1 - Occupant diversity
NC-2009 IEQp1:Minimum IAQ Performanceposted by susan eguia on
Hi, We have existing Library project with combined multiple zone and single zone.
Duct Work
CI-2009 MRc3.1:Materials Reuseposted by Holly Himes on
I think I know the answer, but can duct work be counted towards material re-use?
HELP - Do I have to follow AGMBC?
posted by Dhanujie Jayapala on
Hi, We are doing a project to develop a manufaturing faciltiy for our company.
Why IEQc5 Applies to Entire Building?
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Andrew Gil on
No disputing that the requirements of IEQc5 are both sensible and valuable,, so much so that our firm now incorporates these provisions in ALL projects, regardless of LEED certification intent.
LEED certification in China
posted by Tristan Roberts on
Biao, welcome to the LEEDuser forum!
NC and EBOM
posted by Jane Long on
Hi, I understand that a single rating system must be used, however for a multi building/ multi building type/ LEED rating system (i.e.
Multiple buildings on podium..certifying only one building..??
posted by Anoop Vijay on
Hi, I am trying to figure out if GBCI allows certifying a building alone among multiple towers on a single plot. The target building is a high-rise office tower located above a multi-storey podiu
Any word on LEED Online for Multiple Buildings?
posted by Marcio Alberto Casado Pereira on
Hi folks, LEED Online´s capability for Multiple Bulding project was said to be out on the 1st quarter of 2012. Any updates on that?