Forum quick links
Clarification on minimum energy savings and EA credit 1
NC-2009 EAp2:Minimum Energy Performanceposted by Joanne Haye on
I have a Client that is considering LEED certification, we have done a preliminary energy model, we show a 24% savings off the baseline.
EAc6 forum
posted by Tristan Roberts on
Dana, could you please post this to our EAc6 forum? While you're there, I think you may find the answer from previous posts.
Activity Generated Electricity from a Manufacturing process
NC-2009 EAc2:On-Site Renewable Energyposted by Kendal Neitzke on
Our porject is a manufacturing facility that produces generators and converters for wind turbines. A component of the manufacturing process is the balancing of the generator rotors.
runoff coefficient
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Eric Yao on
what the value of runoff coefficient for gravel area (2% gradient)?
CFCs vs HCFCs
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Zachary Goodnough on
Are HCFCs considered to be CFC based?
"mixed submittal" for EQ pre 3 ?
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Candice Groves on
Curious if anyone has submitted a "mixed submittal" before either during the regular LEED submissions or during an appeal? The project we're working on - some of the spaces comply with calculation
Hi Rachael,
I'm not
posted by Ellen Mitchell on
Hi Rachael, I'm not absolutely sure about the FTE calcs in terms of bike racks, but if I had to guess, I would say that the number of bike racks and showers could be based on employee counts. For
Vestibule vs. Air Curtain
posted by Ralf Lehmann on
The requirements of 5.4.3.4 (ASHRAE 90.1-2007) are very strict. My team is trying to certify a shopping mall with many shops opening directly to the outside.
European Certificates accepted?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Nicole Isk on
Adhesives and sealants must meet the VOC limits defined by the SCAQMD Rule 1168 respectively the Green Seal Standard for Commercial Adhesives GS 36.
"Reasonable Site Boundary"
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Jason Smith on
The MPR's state that "The LEED project boundary may not include land that is owned by a party other than that which owns the LEED project unless that land is associated with and supports normal bui