Forum quick links
Sewage Conveyance from the site
CI-2009 PIf2:Project Summary Detailsposted by Lakshmikanth Kousik Toppe Jeyabalan on
My project is in Singapore and it is a norm here that all the building sewage will be connected to the public utility drains and send for treatment, reclamation & disposal. I have been requeste
feedback comment
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Mónika Egyed on
In our project, the pilot credit was achievable by 50% reduction from WC and urinal water use.
Concerning Carpet
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Omar Elrawy on
Dear all, We have a project where we intend to pursue Option 1 Path 1, We will install furniture after completing the flush-out, but the architect is concerned about the carpet install
VLT x WFR calculation exceeds 0.18
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Indoor Environmental Quality Team LEED Community Project on
I am reviewing Option 1 Path 2 (Prescriptive) for a visitor's center project. There are several private offices where the VLT x WFR value exceeds the 0.18 threshold.
Fundamental Commissioning vs Enhanced Commissioning
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Zeb Foss on
Hello, I am in Canada so we are sill required to use LEED CI 1.0, and I have a question regarding the responsibilities of the CxAs.
SS 7.1-4 LEED Online form issues?
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Wendy Parker, LEED AP on
Is anyone else having issues with filling in the Non-reflective parking spaces table in this form?
Factory Space Default value
CS-2009 IEQp1:Minimum IAQ Performanceposted by John Covello on
Hello, We have a client who is designing a C&S factory. They are not sure who the tenant will be other than a factory space.
Residential grade dishwasher in breakroom
Retail-CI-v2009 WEc1:Water use reductionposted by Robin Dukelow on
The WEp1 language reads: ". . . and are not commercially rated MAY also be excluded.
Fan power calculations
CS-2009 EAp2:Minimum Energy Performanceposted by Eleni Soulti on
Hello, We have received a review from LEED saying that for the baseline model there are inconsistencies between the demand values reported in Table EAp2-5 and Table 1.4. When completing Table 1.4
NAF (GLUE) LETTER
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by jack larson on
I have a letter from the manufacturer stating that the laminating adhesive that will be used in the fabrication of the doors contains no added formaldehyde. (NAF).