Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Remnant Limestone- any LEED credit there?

CS-2009 MRc3:Materials Reuse
posted by  Julie Hendricks  on 

My client wants to use remnant limestone (basically pieces of limestone left over when larger pieces are cut) for exterior siding.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Tue May 10, 2011, 1:29 pm

Occupancy Sensor

CI-2009 EAp2:Minimum Energy Performance
posted by  Simon Sue  on 

We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors).

3
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Tue May 10, 2011, 12:23 pm
5
Tue May 10, 2011, 11:51 am

EAPr2 - Lighting Control (shut-off control and space control)

CI-2009 EAp2:Minimum Energy Performance
posted by  Ramesh Narayanan  on 

Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory p

2
Energy Engineer
CLEAResult Consulting
LEEDuser Basic Member
222 thumbs up
Tue May 10, 2011, 7:12 am
4
Default Avatar
Project Manager
KGO Consultants
LEEDuser Basic Member
19 thumbs up
Fri May 6, 2011, 6:10 pm

Interpretation table 5.5-4 ASHRAE 2007 mandatory provisions

NC-2009 EAp2:Minimum Energy Performance
posted by  Vindio Corro  on 

We are preparing the LEEd for a Stadium in Spain and I have a doubt with the conditioned areas. The level -2 is conditioned and the level -1 (parking) is unconditioned...which is the U-factor we ha

4
Default Avatar
Master Degree Construction Engineering
Anomalia
LEEDuser Basic Member
11 thumbs up
Fri May 6, 2011, 1:35 pm

LEED CS & LEED CI - PV array

CS-2009 EAc1:Optimize Energy Performance
posted by  S. Sachs  on 

Hi, I am working on a LEED CS project, at the same time the tenant is pursuing LEED CI (separate submission) and planning to install a PV array to achieve the 2.5% of building electricty required

3
Default Avatar
(old inactive account)
LEEDuser Basic Member
12 thumbs up
Thu May 5, 2011, 8:27 pm

Estimated crown diameter

Pilot-Credits PC14:Walkable Streets
posted by  Christina Lynch  on 

Does anyone have a good resource for or way of calculating a tree's estimated crown diameter? (Benchmark "m" for NC/CS or "f" for Schools). Thanks!

3
Default Avatar
Atkins
LEEDuser Basic Member
7 thumbs up
Thu May 5, 2011, 7:44 pm

Unirrigated areas in Option 1

NC-2009 WEc1:Water Efficient Landscaping
posted by  Eamon Geary  on 

Hello, One project is working to achieve this credit via Option 1 (50% reduction in potable water use). Through a variety of common methods, we have reduced our irrigation water use.

3
Sustainability Director - Facilities
Michael Baker Jr, Inc.
LEEDuser Basic Member
49 thumbs up
Thu May 5, 2011, 6:38 pm
4
Senior Vice President
Albanese Development Corp.
LEEDuser Basic Member
3 thumbs up
Thu May 5, 2011, 5:08 pm