Areas between PV panels and mech equipment
NC-2009 SSc7.2:Heat island effect - roofposted by R Jones on
I see that there are rulings about not including roof area which is covered in PV or mechanical equipment. Q: does this go as far as determining that the space between panels ( allowing for reason
Indoor/Outdoor Carpeting in Large Open-Air Tropical Lobby
EBOM-2009 IEQc3.5:Green cleaning - indoor chemical and pollutant source controlposted by Terry Gorski on
For a building located in a tropical climate with an open- air lobby around the elevator banks, would indoor/outdoor carpeting completely under the cover of the building meet the requirements?
Design Submission - Table 1.8.1
NC-2009 EAp2:Minimum energy performanceposted by Erika Duran on
We're working on a Residential Project, after the design submission the certification body told us that It was not clear if the Baseline case fan power was modeled correctly.
Development density - project building density
Schools-2009 SSc2:Development density and community connectivityposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
The LEED Reference Guide, in the example calculation for development density, indicates the project building and site must have a 60k sq ft density per acre or more.
Re: Vertical Garden and credits SS 5.1 & 7?
posted by David Posada on
Probably not - see the discussion at http://www.leeduser.com/credit/CS-2009/SSc5.1
Parking areas in stadium
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Adriana Hansen on
We have a stadium project that will be retrofitted (major renovation) and will be certified under the LEED NC rating system.
Window Sill Height
NC-2009 IEQc8.2:Daylight and views - viewsposted by Joseph Greene on
We are working on a project with 42" high window sills. Does this eliminiate any chance of achieving this credit? Must the sills be at 30"?
Multiple Drainage Patterns
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Joseph Blanco on
Can you tell me how to calculate for multiple draingage sites, i have Three on this particular project. The TC is based on the length and travel and the slope towards the discharge point .
2 things mat and chemical mixing area
CI-2009 IEQc5:Indoor chemical and pollutant source controlposted by Sue Barnett on
I have a major building entrance in my LEED boundary as well as some exterior entrances to a courtyard- do I need the mats to the courtyard area too? Then we have restrooms but no janitor closet or
LEED EBOM WEc1: Water Performance Measurement denied in Core & S
CS-2009 IDc1:Innovation in designposted by Adriana Hansen on
We are proposing to install equipment for measuring the consumption of irrigation water, toilets and cooling towers.