Forum quick links
Simple Tips on Defining a Project Boundary
posted by virginia waik on
I am curious about the dos and don'ts of defining a project boundary for our whole bulding LEED NC v3 project.
IEQc4.6 as ID point in LEED NC 2009
NC-2009 IDc1:Innovation in Designposted by Joseph Ford, AIA on
I would like to use IEQc4.6: Low-Emitting Ceiling & Wall Systems from NC-Schools as an ID point in my NC-not a school project.
LEED-ND Costs for large projects
ND-v2009 PIf1:Development Program and Site Typeposted by Lauren Sparandara on
I am assisting on a project that is 8,000 acres. The LEED FAQ sheet suggests that projects greater than 320 acres certify under multiple submissions.
Additionnal Interior Lighting Power
CI-2009 EAp2:Minimum Energy Performanceposted by MATHIEU HOULE on
I'm working on a LEED-CI offices project.
Space Classification
NC-2009 EAc1:Optimize Energy Performanceposted by Blas Beristain on
Hellow Everyone, 1) In the case of a technical space (equipment room) that is a Conditioned Space as per ASHRAE 90.1 and, therefore, must be simulated as a heated/cooled reference office space: Sh
Case 1, Energy cost paid by the tenant
CI-2009 EAc3:Measurement and Verificationposted by Rubén M. R. on
In this case the tenant has a contract with the utility company and pays for his electricity.
Laminate Countertop Adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Erin Cowan on
What category would a Wilsonarte Laminate Adhesive fall under?
IEQ c4.4 and accoustical panel ceilings
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Todd Bundren on
Do the requirements for credit IEQ c4.4 apply to accoustical panel ceilings?
Multiple building - Energy Modeling2
NC-2009 EAc1:Optimize Energy Performanceposted by Marina Andrade on
Hi, I'm working in another project that is attempting multiple building certification.
Accounting for Future Fit-Out Retail Spaces in NC 2009
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Dan Bielenin on
I am trying to determine how to account for core and shell retail spaces located on the ground floor of a project pursuing certification under NC 2009.