Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How should I handle this?

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Valerie Molinski  on 

I have a current project that has a parking lot surrounded by itself and at least two other buildings. The project has 10 dedicated parking stalls as indicated in their lease.

1
Mon Aug 12, 2013, 9:08 pm

Very alternate transportation

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Denise Dauplaise  on 

I'm not exactly sure where to place this question. We have a new client who may be interested in LEED for their building.

1
Fri Aug 16, 2013, 8:40 pm

Water Metering

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Steve Gross  on 

Hello, My question is in regards to what need to be metered on the water side. Does the utility meter suffice or do I need to provide a meter for hot and cold water independently?

1
Tue Aug 13, 2013, 12:57 pm

about the draws in 8.1 and 8.2

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Shenhao Li  on 

Hello i am working on IEQ 8.1 and 8.2, I use simulation methods in 8.1. my question is that can i use diffrient draws in two credit?

1
Tue Aug 13, 2013, 12:52 pm

output summary

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Shenhao Li  on 

In the form, I need Provide an output summary from the daylight computer simulations. does it exist a template to do it? if not, does it need which information in the reports?

1
Tue Aug 13, 2013, 12:45 pm

Construction Submittal

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Jennifer Benedict  on 

Is there any additional items that are required during the construction submittal?

1
Wed Aug 14, 2013, 6:17 pm

Simultaneity factor flushing of toilets and landscape

NC-2009 WEp1:Water use reduction
posted by  Lise Dannesboe  on 

Hej! We are integrating a water tank in our project to supply the toilets with rainwater and to supply landscaping with water.

1
Sun Nov 3, 2013, 7:11 pm

What was your LEED deliverable after the site assessment?

Healthcare-v2009 SSp2:Environmental site assessment
posted by  Jill DeMarotta  on 

What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks-

0

Conditioned vs. unconditioned & natural ventilation

NC-2009 EAc1:Optimize energy performance
posted by  SmithGroup BG+LU FW  on 

Table G3.1 in Appendix G requires only conditioned space be simulated as being both heated and cooled in the proposed design.

1
Fri Aug 16, 2013, 1:02 pm

Option 2 - portion of residential street meets 10 units per acre

NC-2009 SSc2:Development density and community connectivity
posted by  Jay DeVilbiss  on 

Hello, I have a question regarding the requirement for a residential neighbourhood meeting a min density of 10 units per acre for Option 2 - Community Connectivity.

1
Fri Aug 16, 2013, 9:02 pm