Forum quick links
New requirements in Version 5.0 form for LEED-EB: O&M v3/2009?
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Peter Dahl on
I’m seeing Version 5.0 of the IEQp1 form for LEED-EB: O&M appear in some of my projects.
Cool Initiative
posted by Kathryn West on
I call dibs on the Bahamas and Maldives! :) I'm surprised the Maldives haven't documented LEED compliance for any buildings they are very eco-friendly.
Wood waste to be recycled into biomass fuel
NC-2009 MRc2:Construction waste managementposted by Noriko Nagazumi on
Hi, Our project emits a certain volume of wood waste, which is used mainly for packaging equipment.
Design review appeal
posted by Inés Alomar on
We have been denied a prerequisite from the Design Phase after the second review, and now we need to appeal them or start with the construction review. We have two main questions: Do we have any ti
ASHRAE/IECC Compliance for AHU's, RTU's and Heat Pumps
NC-2009 EAc3:Enhanced commissioningposted by Peter Dishno on
Hello Design Review Experts, During a design review for a residential high rise, we noted that several areas of common space did not seem to have the capacity to use an economizer, Demand Control
Use of EA Cr 6 for a CS Project
EBOM-2009 EAc6:Emissions reduction reportingposted by emily reese moody on
Hi, I'm wondering if anyone has tried attempting this credit as an ID strategy in a CS project.
Campus projects with different rating system
posted by Lolita Wu on
Hi all, We are working on a master site project with three single buildings in the block. Two office buildings are pursuing LEED CS and one hotel building is pursuing LEED NC.
translucent privacy glazing & EQc8.1 / 8.2
CI-2009 IEQc8.1:Daylight and views - daylightposted by John Steingraeber on
We are pursuing LEED CI certification for a client who has requested the application of translucent window film in some spaces for security concerns.
On Site Renewable
EBOM-2009 EAc4:On-site and off-site renewable energyposted by Joseph Snider on
The project would like to consider this credit. For that a PV system was previously installed and has been in operation within the performance period.
water efficiency review
NC-2009 WEc3:Water use reductionposted by Shristi Bajracharya on
When we sent the WE credit for review for our project, we sent a water use calculation stating that the potable water usage in the project has been reduced by 43% from a calculated baseline design.