Solar Panels outside LEED project boundary
NC-2009 EAc1:Optimize Energy Performanceposted by Kalyan Nishtala on
Hi, I am currently working on a LEED project which will pursue renewable energy credit and also count the savings towards EAc1 points.
M&V Template - End Use Metering Table
NC-2009 EAc5:Measurement and Verificationposted by Candice Rogers on
Hello - We're submitting for M&V under LEEDv2009. We're going with Option D - Calibrated Simulation. Our energy model did not use the performance path.
LeedOnLine Forms Incorrect
CS-2009 EAp2:Minimum Energy Performanceposted by Thomas Newbold on
I am having a problem with LeedOnLine and USGBC hasn't been any help.
SEED evaluator tool
ND-v2009 NPDc12:Community outreach and involvementposted by USGBC Colorado on
Are you aware of project teams using the SEED (social, economic, environmental design) evaluator tool http://www.seednetwork.org/ as a strategy to achieve this credit?
Contractual Relationship
CI-2009 EAc2:Enhanced Commissioningposted by Brian Smith on
The owner is looking for CI-2009 Enhanced Cx on a project. The CxA was originally contracted through the GC as they were not a prequalified vendor of the Owner.
Documentation for upload
NC-2009 SSc1:Site Selectionposted by Olga Kozub on
I have a project in Russia. In Russia we use the local equivalent of the United States Code of Federal Regulations named State Immovable Property Cadastre.
Materials to be included
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Michael Haugeneder on
We are working on a project in Berlin.
Accessible Bus Stop
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Brett Beckemeyer on
Our project has several bus stops within the 1/4 mile radius, and what I would consider to be the most direct route along the street to the stops is also within 1/4 mile walking distance.
Rating System selection for an Existing Retail building
posted by Therese Malm on
We have a building which is an existing retail & manifacturing building. Which rating system is the most appropriate for seeking certification: EBOM or CI Retail?
Green roof deck
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by mariela garate on
Hi, We are willing to use an innovative type of green roof that's based on compacted plastic waste board and textile (1,3cms thickness + textile). This substrate replaces the need of soil.