Schools-NC-v4 LTc6:Bicycle facilitiesposted by Cora Kenrick on
Hi Fellow LEED Users,
Individual Occupant Space - Task Lighting
NC-v4 EQc6:Interior lightingposted by Daniel Thien on
I've seen several questions on this forum that address task lighting, but I still am a bit confused.
Is a Sports Field Considered Graded or Prime Farmland?
NC-2009 SSc1:Site Selectionposted by Sophie Kerr on
Hello,
What is the difference between extraction point and manufactured point?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Carrie Willis on
Is manufactured point where we actually make the casegoods in our plant? Or is it where the panels are made from the extracted raw material?
LEED Rating System Change
posted by Magda Aghababyan on
I have already registered a project under LEED v2009 Existing Building Operations and Maintenance.
HVAC Fans Schedules
NC-v4 EAp2:Minimum energy performanceposted by Ahmed Labeeb on
Dear,
I am working on a residential project served by VRF system. The fresh air stream is mixing with the return air before each space's FCU.
HVAC Fans Schedules
NC-v4 EAc2:Optimize energy performanceposted by Ahmed Labeeb on
Dear,
I am working on a residential project served by VRF system. The fresh air stream is mixing with the return air before each space's FCU.
Exceptional Calculation - Baseline Building
NC-v4 EAc2:Optimize energy performanceposted by SAMY Chamy on
Dear All:-
no parking
NC-v4 LTc7:Reduced parking footprintposted by Emmanuel Pauwels on
If the project does not provide any parking, can the credit be obtained?
Baseline - System 5, no cooling
NC-2009 EAp2:Minimum Energy Performanceposted by Zsolt Bako-Biro on
I have a 11000 sqm warehouse (3 units) 24/7 in operation with natural ventilation, no cooling designed or required, heated to 15°C. The OA requirement is met by the level of infiltration of 0.