Forum quick links
Use of Recharge Pits for credit compliance
EBOM-v4 SSc2:Rainwater managementposted by Aarti Dhar on
Will the Use of Rainwater recharge pits comply with the credit requirement?
IEQp1 form - Selecting Critical Zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Madushan Samarakoon on
How to answer the following requirement in the IEQp1 form when you already filled the Minimum IEQ perfromance calculator with all occupiable zones in it and it has already automatically selected th
Existing Buildings
NC-2009 EAp2:Minimum Energy Performanceposted by David Tratt on
Do I understand correctly from 90.1 Table G3.1 item 5f for baseline building that I can input the existing envelope conditions in the baseline model in lieu of the 90.1 minimum envelope requiremen
Addition to an existing LEED Certified Building
CS-v4 MPR2:Must use reasonable LEED boundariesposted by maria esther lamadrid on
I have an existing LEED Certified Core & Shell v2009 Project where there will be an addition of about 40% more.
MSA hard hat safety advisory
posted by Jennifer Taranto on
MSA has issued a safety advisory because they have received field reports that their green colored MSA V-Gard Protective Caps are cracking.
Choosing LEED ND Plan vs Built Project
posted by Susan Di Giulio on
Where can I find more in-depth information about how to choose between these two versions of LEED-ND v4?
Parking Area Square Footage
NC-2009 PIf2:Project Summary Detailsposted by Jim Pugh on
With respect to calculating the "Square footage of all parking areas" . . .
New V4 Project Boundary Overlaps Existing V2009 Project Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Doug Shilo on
An existing V2009 Project is getting an expansion that will fall under V4.
Rounding off the percentage to nearest whole number
NC-2009 MRc4:Recycled Contentposted by Vibha Pai on
I am working on the certification of a mixed use building and the recycled content used on the project is currently at 9.56%. Can it be rounded off to the nearest whole number a
Minimal Non-roof for LEED Major Renovation Project
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
The LEED project in question is currently under debate regarding sidewalk upgrade. Originally, the plan was to upgrade the sidewalk, but then that plan was trashed. Now it seems the sid