Requirements for "Ongoing Feedback Mechanism"?
CI-v4 IPc1:Integrative processposted by Renee Shirey on
The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,
1 EV charging station for 2 spaces and Vehicle Fueling Capacity per Station
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Edgar Arevalo on
I was informed that the LEED project in question has 1 charging station and two reserved parking spots. Am I to assume that this station has two charging cables, one for each spot, or should
EQpc44
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Lou Niles II on
We pursued this pilot credit on one of our interior projects and did well with only one set of comments.
PV panels outside the Leed project boundary
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Hello to all Leed User community,
I have following question:
Is it possible for the credit Otpimize enetgy performance to count PV panels that are located outside the LPB?
LEED for Healthcare
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
Hello Marcus,
Why is there a sliding scale for Healthcare as opposed to New Construction?
Water Efficiency in CS
posted by Susan Di Giulio on
We are doing a large LEED-CS office building. The owner will provide 2 large restrooms with extremely low water fixtures for tenant employees on each floor.
All equipment tested as part of commissioning?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jill Watkins on
I am LEED consultant on a convention center renovation/addition and some team members are asking whether or not all equipment needs to be tested in all modes of operation, or if one of each ty