Forum quick links
BDC v4.1 - Option 2 - Path 2 - Affordable housing at winery
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Kevin Gilleran on
Hi,
# of Bird collisions vs. Location
Warehouses-NC-v4.1 INc1:Innovationposted by Angela Nekoranik on
Hi all! I was curious to know if the impact of this credit has been recorded / if location of the building plays a role.
Window Contacts / FCU Operations
posted by Allison Wilson on
Hi there Hive Mind! Hope everyone's doing well and staying cool in the heatwave all over.
Lighting tab - unconditioned spaces
NC-v4 EAp2:Minimum energy performanceposted by Paul Caicedo on
Hello,
I am using DesignBuilder to export the minimum energy performance calculator spreadsheet; unconditioned spaces are not filled in the Tab Lighting.
Does recessed lighting under a canopy have to be accounted for in SSc6?
CS-v4 SSc6:Light pollution reductionposted by Wen Zhang on
We are working on a project where recessed pot lights are installled under a canopy.
Prefabricated or modular structure Buildings
NC-v4 MPR1:Must be in a permanent location on existing landposted by VISHAL JAIN on
Hello,
Would like to know more details on how "Prefabricated or modular structure Buildings" can be certified under LEED.
Innovation - PILOT - ergonomics approach for computer users
NC-v4 INc1:Innovationposted by Anina Mbilinyi on
I registered EQpc44 on March 4, 2021 with V4.0 project. The documents are complete and went to LEED Online to finalize documentation and the pilot credit was gone from the form.
Electric heat pumps - share of EE according to german law
NC-v4.1 EAc5:Renewable Energyposted by J Schütz on
Dear all,
for our projects in germany its quite controvers to communicate towards the project teams, why electric heat pumps cannot contribute to the credit renwable energy.
Achieving prerequisite for project that was converted from VRF to DCS
CS-v4 EAp2:Minimum energy performanceposted by K Pomperada on
I am working with a project with design revisions from VRF to DES. How can we meet prerequisite if the the initial evaluation chiller efficiency is 0.63 kW/TR (Cooling Capacity is 2300TR 
Window Contacts and ASHRAE90.1 / Innovation Credits?
NC-v4 EAp2:Minimum energy performanceposted by Allison Wilson on
Hi there,