Forum quick links
Urgent: Possible to combine TallyCat architectural and structural project files together?
posted by Teresa Jan on
My apologies if I posted this question twice ont he forum - I am a newbie on this forum.
Multi-family Stormwater alternative documentation
NC-v4.1 SSc4:Rainwater Managementposted by Summer Gorder on
Our project is in Seattle with stringent Stormwater requirements.
Zone Secondary Recirculation Fraction
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dave Hubka on
ASHRAE 62.1, Section A1.2.2 states:
Er is less than 1.0 for plenum return systems with secondary recirculation (e.g. fan-powered VAV with plenum return)
Creating Baseline ΗVΑC system selection based on ΑSHRAE 90.1-2010 - Does Ground Floor count as….
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all LEED Users,
Ιn our project the Building (nonresidential – 8.000 m2) consists of following levels:
Bioretention Area Calculation
NC-v4 SSc4:Rainwater managementposted by on
I was wondering about how to calculate the Area of bioretention needed to manage expected runoff on the Reference Guide v4 example.
Baseline System for Data center
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi All, I have read som many answers regarding the baseline system for Data centers, Some are saying use system 8 some are saying use system 3 and 4, which one is the right system?
CSR Sample
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Edgar Arevalo on
I'm reviewing shop drawings for LEED info. The contractor provides a sample of the BPDO calculator filled out with data that is suppose to reflect information from the documents attached