Forum quick links
Non Attainment Area (Project Location)
CS-v4 EQp1:Minimum indoor air quality performanceposted by Nagaraj Sankar on
Ventilation for Shipping / Receiving (Local law vs ASHRAE)
NC-v4 EQp1:Minimum indoor air quality performanceposted by G.J. Teunissen on
Hi,
Systems requiring metering
CS-v4 EAc3:Advanced energy meteringposted by Tim Nabholz on
Hi All, I am pursuing this credit for a LEED v4 Core and Shell project and am having trouble determining which systems require meters.
"Case 2, Option 2: Benchmarking against Historical Data"
EBOM-v4 EAp2:Minimum energy performanceposted by Ramon Christopher Medrano on
We like to seek for an advice for EAp2: Minimum Energy Performance, we are pursuing "Case 2, Option 2: Benchmarking against Historical Data" our quarries are listed below:
Total Water Demand for Irrigation (Tank sizing, Plant Sizing, Network Sizing etc.)
NC-v4 WEp1:Outdoor water use reductionposted by Tariq Muhammad on
Dear All,
Do we have the possibility of combining the two requirements between 2 options of Glare ?
NC-v4.1 EQc6:Interior Lightingposted by Sara BENLOUBA on
Dear All,
We are looking for a clarification regarding the EQ credit "Interior Lighting" – of LEED V4.1, about option “GLARE CONTROL”.
Reviewer requires cutsheets
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit. I need to as
Reviewer requires cutsheets
CI-v4 EQc6:Interior lightingposted by Edgar Arevalo on
Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit. I need to as
Glare Control for Regularly Occupied Spaces
NC-v4.1 EQc6:Interior Lightingposted by Lauren Kottis on
"For all regularly occupied spaces, meet one of the following requirements:
Building Reuse Option 3 on Shell buildings -- LEED C/S v4 - new guidance on interiors and finish
CS-v4 MRc1:Building life-cycle impact reductionposted by Landry Watson on
We are getting some comments from the reviewer that indicate 1) We must include surfaces of interior non-structural walls in our calcs (this is new from other versions guidance) and 2) that w