Forum quick links
Paint and coating - underground car park and technical platroom
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Julien Daclin on
Does this credit also apply to paint and coatings located in an underground car park and technical plantrooms?
Commercial Building with Tenant spaces fully submetered
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Energy Spectrum on
I am wondering if a commercial building, where over 90% of the building is submetered tenant space would qualify for this credit.
Least Toxic Pesticide - Essentria IC3 ?
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Kimberlee Dobbins on
If a product is represented as a Minimum-Risk pest control product and qualifies for exemption from EPA registration under FIFRA 25b, does that mean it is least toxic for LEED purposes?
Reducing Impervious a requirement or a strategy?
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Lauren Ford on
If we are increasing the total impervious area on the site, but treating the stormwater to reduce the TSS, do we still meet the intent of the credit?
Hotel and counting drop-off spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Lauren Ford on
Hello - we have a hotel project and are attempting Option 1. The question is - we are meeting the zoning requirement for number of spaces, PLUS we have 3 drop-off (15 minute) spaces.
Additional space during the final design appeal
posted by Katherine Ann Resurreccion on
Our CI project is a 4-floor office space located in a 10-floor commercial building. We used the split-review option and are currently working with the Final Design Appeal.
Impervious hardscape area at podium
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Caroline Ma on
Is the impervious hardscape area at podium considered as the non-roof hardscape?
Partial Building Energy Star Score
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by SIG - Sustainability Main Account on
I am analyzing a 40 story vertical mixed use tower for LEED EBOM. It is split 50/50 between office and condos-both under separate ownership, management, and metering.
Prereq denied based on review team misunderstanding
posted by Liz Valdez on
I just got my final review comments back for my project and EAp2 was denied. As a result, we didn't get any energy credits and we did not get certified.
composite wood flooring
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Ed Clark on
I wanted to double check that wood veneer flooring with a composite base would base would have to comply with both IEQc4.4 and IEQc4.3.