Forum quick links
EA 6.1 Good HVAC Design and Installation
posted by Ricky Li on
There is a note stating that "Homes with no heating must follow the performance approach (e.g. EA1), and may not use the prescriptive pathway".
Cost to be Excluded in the total proj material costs for MR CR3
NC-2009 MRc3:Materials Reuseposted by Benjie Herrera on
I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc.
Ventilation for storage an mechanical rooms
Schools-2009 IEQp1:Minimum IAQ Performanceposted by Rodrigo Ubilla on
Dear experts, We are working on a university building wich has 2 underground floors, with mechanical and storage rooms in them, all these rooms are adjacent to the stairs.
Pilot Credit Content?
Pilot-Credits EQpc22:Interior lighting - qualityposted by Jonathan Weiss on
The content listed here on this page differs from the current content on the USGBC website - they have a similar but different set of requirements listed. Which one is currect?
Water heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
I have to model a building which is using solar pannels electric heaters.
Cumulative Facade Intrusion?
Pilot-Credits PC14:Walkable Streetsposted by Kimberly Frith on
Our project has two facades extending along sidewalks. Going by the credit requirements, we cannot have more than fifty feet of blank facade.
Residential Bike Storage in Apartments?
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Kimberly Frith on
The construction requirements for the bicycle storage seem to suggest centralized bicycle parking.
Public tranportation Access
CI-2009 SSc2:Development Density and Community Connectivityposted by ANDREW MOISEEV on
We have a bus stop right outside our door and a second route a mere .32 miles away, will that be acceptable, how hard and fast is the 1/4 mile rule?
bicycle storage and changing rooms
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by B MS on
We are working on a mixed used (commercial and residential) building. We have FTE 421 in commercial whereas total no. of residents is 28. the peak transients is 731. we calculated the no.
Is it possible to get post development run off in negative?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by B MS on
Our project is located in Kathmandu, Nepal and I have a few questions regarding the following points. 1.